Laserfiche WebLink
Contractor's Price Proposal - Detail Continues.. <br />Work Order Number: <br />108749.00 <br />Work Order Title: <br />Indian River County - Jones Pier Residence <br />Section - 31 <br />105 31 25 14 26 0004 <br />LF 2' High Silt Fence with Stakes at 6' On Center <br />$934.09 <br />Quantity <br />Unit Price <br />Factor <br />Total <br />Installation 500.00 x <br />1.51 <br />x 12372 = <br />934.09 <br />silt fence for erosion control <br />106 31 25 14 26 0017 <br />LF Removal Of Silt Fence And Stakes <br />$259.81 <br />Quantity <br />Unit Price <br />Factor <br />Total <br />Installation= <br />500.00 x <br />0.42 <br />x 12372 <br />259.81 <br />removal of silt fence <br />107 31 31 16 13 0003 <br />SF Termite Pretreatment, Commercial Slab And Walls <br />$1,549.96 <br />Quantity <br />Unit Price <br />Factor <br />Total <br />Installation 1,440.00 x <br />0.87 <br />x 1.2372 = <br />1,549.96 <br />termite treatment <br />Subtotal for Section - 31 <br />$95,838.92 <br />Section - 32 <br />108 32 11 23 16 0006 <br />SF 6" Crushed Aggregate Base Course For Sidewalks <br />$154.77 <br />Quantity <br />Unit Price <br />Factor <br />Total <br />Installation= <br />90.00 x <br />1.39 <br />x 1.2372 <br />154.77 <br />base for the sidewalk <br />109 32 11 23 16 0006 <br />0012 MOD For Up To 1,000, Add <br />$42.31 <br />Quantity <br />Unit Price <br />Factor <br />Total <br />Installation 90.00 x <br />0.38 <br />x 1.2372 <br />42.31 <br />110 32 11 29 13 0002 <br />SY 6" Thick FDOT Limerock <br />$1,850.72 <br />Quantity <br />Unit Price <br />Factor <br />Total <br />Installation 33.00 x <br />45.33 <br />x 12372 - <br />1,850.72 <br />stabilized subgrade for marl path and sidewalk <br />111 32 11 29 13 0002 <br />0008 MOD For Up To 500, Add <br />$396.84 <br />Quantity <br />Unit Price <br />Factor <br />Total <br />Installation 33.00 x <br />9.72 <br />x 1.2372 = <br />396.84 <br />112 32 15 40 00 0004 <br />CY Limestone Screenings For Trail <br />$2,338.60 <br />Quantity <br />Unit Price <br />Factor <br />Total <br />Installation= <br />32.00 x <br />59.07 <br />x 1.2372 <br />2,338.60 <br />marl pathway <br />113 32 16 23 00 0013 <br />SF 6" Cast In Place Concrete Sidewalk With Fiber Mesh <br />$847.36 <br />Quantity <br />Unit Price <br />Factor <br />Total <br />Installation 90.00 x <br />7.61 <br />x 1.2372 = <br />847.36 <br />concrete sidewalk <br />114 32 16 23 00 0013 <br />0091 MOD For Up To 100, Add <br />$325.14 <br />Quantity <br />Unit Price <br />Factor <br />Total <br />Installation 90.00 x <br />2.92 <br />x 1.2372 = <br />325.14 <br />115 32 31 13 13 0016 <br />CF Jackhammer Post Hole In Rock <br />$2,132.10 <br />Quantity <br />Unit Price <br />Factor <br />Total <br />Installation 49.00 x <br />35.17 <br />x 12372 = <br />2,132.10 <br />jackhammer existing blocks <br />116 32 92 23 00 0048 <br />MSF >1,000 To 4,000 SF, Bahia Argentine Sod, Installed On Level Ground <br />$5,120.89 <br />Quantity <br />Unit Price <br />Factor <br />Total <br />Installation 810 x <br />511.00 <br />x 1.2372 = <br />5,120.89 <br />sod <br />Contractor's Price Proposal - Detail <br />Page 11 of 12 <br />10/27/2022 <br />