Laserfiche WebLink
M J MASTELLER & MOLER INC. 165527 1h Street, Ste. 2, Vero Beach, FL 32960 <br />M — CIVIL ENGINEERS — (772) 567-5300 <br />AMENDMENT 3 TO CCNA2018 WORK ORDER 1 <br />HOBART PARK BASEBALL FIELDS - IRC -1759 <br />EXHIBIT A <br />Indian River County plans to construct the Hobart Park Baseball Complex as a Single -Phase <br />Project. In addition, it is understood the County proposes to directly contract with Musco <br />Lighting for the furnishing and installation of all site lighting poles and fixtures to include all <br />electrical wiring from handholds at the base of each fixture pole to the lighting fixture. This <br />Amendment No. 3 is intended to update and replace any prior incomplete services for this project. <br />In order to allow for the Hobart Park Baseball Complex improvements to be to be constructed, <br />we shall perform the following scope of services: <br />Scope of Work: <br />Task A — Building Code Compliance Review: The Florida Building Code (FBC) was last updated in <br />2020. As such, it will be necessary for the proposed structure's design to be reviewed by the <br />project Architect and their sub -consulting engineers to confirm the design complies with the <br />latest version of the FBC. <br />Task A does not include revisions that may be required as a result of the code compliance review. <br />In the event the code compliance review results in a need for revisions to the plans, the revisions <br />will be proposed as an "Additional Service". <br />Task B — Update Construction Plans / Technical Specifications: As requested by the Parks & <br />Recreation Division, we shall update the Construction Plans to reflect the following changes to <br />the scope: <br />1. The Construction Plans will be adjusted to reflect the entire project to be constructed in <br />a single phase. <br />2. As the furnishing and installation of all Site Lighting will be via a direct contract between <br />Indian River County and Musco, the Construction Plans will be revised to reflect the <br />Contractor will need only to provide electrical conduit and wiring to handholds at the base <br />of lighting poles and/or fixtures. (All wiring from the handhold to the lighting fixtures will <br />be furnished and installed by Musco under a separate, direct contract with Indian River <br />County.) <br />3. The Construction Plans will be updated to reflect the adoption of the Federal Emergency <br />Management Agency (FEMA) FIRM's adopted January 26, 2023 including adjustment to <br />the proposed finished floor elevation if required. This will include updating the location <br />of the FEMA flood zone lines and designations on the construction plans. <br />Task B does not include any services related to updating landscape plans, irrigation plans, and <br />structural plans. <br />Page 1 of 5 <br />