Laserfiche WebLink
MJ MASTELLER & MOLER, INC. <br />1655 27`h <br />Ste. 2, Vero Beach, FL 32960 <br />M CIVIL ENGINEERS — (772) 567-5300 <br />"... the project landscape architect or landscape contractor shall certify in writing <br />the date he or she last inspected the landscape installation and that all installed <br />landscape material that is required by ordinance is Florida No. 1 or better." <br />Fee Schedule: <br />Masteller & Moler, Inc. proposes to provide the above Scope of Services based on the <br />following lump sum fees: <br />Task A — Building Code Compliance Review <br />Masteller & Moler $ 1,210.00 <br />Architect incl. Structure Subs $ 1,650.00 <br />Task B — Update Construction Plans / Technical Specifications <br />Masteller & Moler $ 6,400.00 <br />Architect incl. Structure Subs $ 6,460.00 <br />Electrical Sub -consultant (Site Only) $ 6,600.00 <br />Task C — Approvals / Permits Renewals <br />Masteller & Moler $ 7,930.00 <br />Architect incl. Structure Subs $ 825.00 <br />Task D - Preliminary Building Department Permit Application <br />Masteller & Moler $ 1,120.00 <br />Architect incl. Structure Subs $ 300.00 <br />Task E — Construction Cost Estimate <br />Masteller & Moler $ 12,470.00 <br />Architect $ 5,335.00 <br />Electrical Sub -consultant (Site Only) $ 4,400.00 <br />Task F — Biddine Services <br />Masteller & Moler $ 10,820.00 <br />Architect $ 3,850.00 <br />Electrical Sub -consultant (Site Only) $ 1,100.00 <br />Structural Sub -consultant (Site Only) $ 460.00 <br />Landscape Sub -consultant $ 1,375.00 <br />Task G — Construction Administration Services <br />Masteller & Moler $ 65,000.00 <br />Architect $ 6,600.00 <br />Electrical Sub -consultant (Site Only) $ 4,400.00 <br />Landscape Sub -consultant $ 5,170.00 <br />Reimbursable Expenses estimated $ 3,000.00 <br />FDEP General Wastewater Permit $250.00 review fee is included. No other permit review fees <br />are not included within our fees. <br />Excluded: Site Lighting & Irrigation Contract Inspection & Certification <br />Page 4 of 5 <br />