Laserfiche WebLink
M) MASTELLER & MOLER, INC. <br />M, — CIVIL ENGINEERS <br />EXHIBIT A <br />165527 1h Street, Ste. 2, Vero Beach, FL 32960 <br />(772) 567-5300 <br />The Indian River County Parks and Recreation Division (IRCPRD) plans to add a covered pavilion, exercise <br />equipment pad, and interconnected walk / maintenance vehicle path(s) at the Intergenerational (iG) <br />Recreation Center. Under Work Order 4 of the 2018 Agreement, Masteller & Moler, Inc. (MM) performed <br />conceptual planning and submitted for, and attended, an IRCCDD Pre -Application Conference <br />This Work Order proposes to provide for the engineering design and preparation of construction plans, site <br />planning and project permitting, bidding services, and construction administration and observation services <br />for the Intergenerational Recreation Center Improvements project. <br />Scope of Work: <br />Task A — Surveying Services <br />Masteller & Moler, Inc. shall use the services of our survey sub -consultant Masteller, Moler, & Taylor, Inc. <br />to provide a Site Survey and for Engineering Utility & Site Design purposes for this project. The proposed <br />concrete pavilion and fitness pads will be located north of the existing recreational field and west of the <br />existing dry retention area. The proposed, potable water service extension for the drinking fountain will <br />begin south of the existing fire hydrant gate valve along the west side of the existing service drive and <br />thence proceed west the proposed accessible walkway to the proposed drinking fountain location. <br />Masteller & Moler, Inc. shall locate all specimen hardwoods greater than 4" in caliper and all Cabbage <br />palms with 10' or greater of clear trunk within the proposed clearing limits. <br />The Site Survey will include location of all visible improvements within the proposed project limits and <br />detailed information as needed along the proposed utility extension(s). Elevations will be based on NAVD <br />1988 and cross sections will be obtained on an as -needed basis. Base Plans will be generated showing the <br />Site Survey information for use in preparing the Engineering Design Construction Plans. <br />Task B — Engineering Design & Preparation of Construction Plans <br />Masteller & Moler, Inc. shall use the aforementioned Base Plans for design and preparation of <br />Construction Plans for the location and requirements for the proposed 26' x 26' concrete pavilion pad, 31' <br />x 24' concrete fitness pad, ADA accessible concrete sidewalk, looped concrete walking path, stabilized <br />walking path, drinking fountain (by others) with concrete pad and potable water service extension. <br />Consultant shall prepare plans and specifications which shall include requirements for connection of the <br />new potable water utility to existing system and requirements for the extension of the existing utility. <br />Task C — Minor Site Plan Approval <br />A Pre -Application Conference with the Technical Review Committee (TRC) was held on February 27th, 2023 <br />to discuss the Project requirements based on a Conceptual Site Plan that was submitted along with the <br />Conference request. Masteller & Moler, Inc. shall utilize the aforementioned design and construction <br />plans for submittal to the County Planning Department to secure Minor Site Plan Approval based on <br />comments provided by TRC Staff at the pre -application conference. The Plans shall include improvements <br />necessary to facilitate Minor Site Plan Approval generally including but not limited to: <br />• Location of the proposed concrete pavilion and fitness pads with concrete sidewalk; <br />Page 1 of 3 <br />