My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-116
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-116
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2023 3:54:34 PM
Creation date
7/3/2023 3:54:01 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
06/20/2023
Control Number
2023-116
Agenda Item Number
8.W.
Entity Name
Masteller & Moler, Inc.
Subject
Work Order No. 2 Intergenerational Recreation Center Dick Bird Park Improvements
continuing consulting engineering services, RFQ 2023015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MJ MASTELLER & MOLER, INC. <br />M1 — CIVIL ENGINEERS <br />Task F — Construction Administration and Observation <br />165527 1h Street, Ste. 2, Vero <br />FL 32960 <br />(772) 567-5300 <br />Masteller & Moler, Inc. shall provide engineering services as needed during the construction of the project <br />generally including but not limited to the following: <br />1. Preparation for and attendance of a mandatory pre -construction meeting; <br />2. Periodic construction observations as needed; <br />3. Perform the walkthrough at the end of the construction; <br />4. Provide a punch list to the Contractor; <br />5. Review the As -built drawings; <br />6. Prepare Project Close-out/Certification documents. <br />Deliverables —The ENGINEER shall provide the COUNTY: <br />a. 60% Construction Plans and Preliminary Specifications — 1 Hard Copy + PDF <br />b. Final Construction Plans - 2 Sets + PDF <br />C. Bid Documents and Final Specifications necessary for Advertisement and Bidding of the work <br />d. Related digital AutoCAD, DOC, and PDF files <br />TIME SCHEDULE <br />Project shall be completed as follows: <br />Engineering Design & Preparation of Construction Plans (after NTP Receipt) 60 Working Days <br />Submittal of Permit Applications (after NTP Receipt) 80 Working Days <br />FEE SCHEDULE <br />The COUNTY agrees to pay, and the ENGINEER agrees to accept a maximum not -to -exceed amount of <br />$54,340.00 for the above-described services rendered based on the following: <br />Task A— Surveying Services $ 4,500.00 <br />Task B — Engineering Design & Preparation of Construction Plans $ 19,200.00 <br />Task C — Minor Site Plan Approval* $ 4,160.00 <br />Additional rounds of responses, hourly NTE (if necessary) $ 2,710.00 <br />Task D — Permitting* $ 8,730.00 <br />Task E — Bidding Services and Specifications $ 7,110.00 <br />Task F — Construction Administration Services $ 7,930.00 <br />Project Total $ 54,340.00 <br />* Permit review fees are excluded from this Work Order. <br />File#2302 <br />(2302_iG Park] m p_Exh i bitA_23-0525.docx) <br />Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.