My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-132
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-132
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2023 1:12:26 PM
Creation date
7/5/2023 1:10:45 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
06/20/2023
Control Number
2023-132
Agenda Item Number
15.B.3.
Entity Name
Ryan Incorporated Southern
Subject
EJCDC Standard Agreement & Update to the Solid Waste Disposal District rate study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.2 Pay Requests. Each request for a progress payment shall be submitted on the application for <br />payment form supplied by OWNER and the application for payment shall contain the <br />CONTRACTOR's certification. All progress payments will be on the basis of progress of the <br />work measured by the schedule of values established, or in the case of unit price work based on <br />the number of units completed. <br />5.3 Paragraphs 5.1 and 5.2 do not apply to construction services work purchased by the County as <br />OWNER which are paid for, in whole or in part, with federal funds and are subject to federal <br />grantor laws and regulations or requirements that are contrary to any provision of the Local <br />Government Prompt Payment Act. In such event, payment and retainage provisions shall be <br />governed by the applicable grant requirements and guidelines. <br />5.4 ACCEPTANCE AND FINAL PAYMENT: Upon receipt of written notice that the work is <br />ready for final inspection and acceptance, the ENGINEER will promptly make such <br />inspection and when the ENGINEER finds the work acceptable under the terms of the <br />Contract and the Contract fully performed, the ENGINEER will promptly issue a final <br />completion certificate stating that the work provided for in this Contract has been completed, <br />and acceptance by the OWNER under the terms and the conditions thereof is recommended <br />and the entire balance found to be due the CONTRACTOR, will be paid to the <br />CONTRACTOR by the OWNER following County Commission approval of the final <br />Contract payment. <br />5.5 Acceptance of Final Payment as Release. The acceptance by the CONTRACTOR of final <br />payment shall be and shall operate as a release to the OWNER from all claims and all <br />liability to the CONTRACTOR other than claims in stated amounts as may be specifically <br />excepted by the CONTRACTOR for all things done or furnished in connection with the <br />work under this Contract and for every act and neglect of the OWNER and others relating to <br />or arising out of the work. Any payment, however, final, or otherwise, shall not release the <br />CONTRACTOR or its sureties from any obligations under the Contract Documents or the <br />Payment and Performance Bonds. <br />ARTICLE 6 INTEREST <br />Not Applicable. <br />ARTICLE 7 CONTRACTOR'S REPRESENTATIONS <br />In order to induce OWNER to enter into this Agreement, CONTRACTOR makes the <br />following representations: <br />7.1 CONTRACTOR has familiarized itself with the nature and extent of the Contract Documents, <br />work, site, locality, and all local conditions and laws and regulations that in any manner may <br />affect cost, progress, performance or furnishing of the work. <br />7.2 CONTRACTOR has studied carefully all reports of explorations and tests of subsurface <br />conditions and drawings of physical conditions which are identified in the Supplementary <br />Conditions as provided in Paragraph 5.03 of the General Conditions, and accepts the <br />determination set forth in Paragraph SC - 4.02 of the Supplementary Conditions of the extent <br />00530-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.