Laserfiche WebLink
of the technical data contained in such reports and drawings upon which CONTRACTOR is <br />entitled to rely. <br />7.3 CONTRACTOR has obtained and carefully studied (or assumes responsibility for obtaining <br />and carefully studying) all such examinations, investigations, explorations, tests, reports and <br />studies (in addition to or to supplement those referred to in Paragraph 7.2 above) which pertain <br />to the subsurface or physical conditions at or contiguous to the site or otherwise may affect the <br />cost, progress, performance or furnishing of the work as CONTRACTOR considers necessary <br />for the performance of furnishing of the work at the Contract Price, within the Contract Time <br />and in accordance with the other terms and conditions of the Contract Documents, including <br />specifically the provisions of Paragraph 5.03 of the General Conditions; and no additional <br />examinations, investigations, explorations, tests, reports, studies or similar information or data <br />are or will be required by CONTRACTOR for such purposes. <br />7.4 CONTRACTOR has reviewed and checked all information and data shown or indicated on the <br />Contract Documents with respect to existing underground facilities at or contiguous to the site <br />and assumes responsibility for the accurate location of said underground facilities. No <br />additional examinations, investigations, explorations, tests, reports, studies or similar <br />information or data in respect of said underground facilities are or will be required by <br />CONTRACTOR in order to perform and furnish the work at the Contract Price, within the <br />Contract Time and in accordance with the other terms and conditions of the Contract <br />Documents, including specifically the provisions of Paragraph 5.05 of the General Conditions. <br />7.5 CONTRACTOR has correlated the results of all such observations, examinations, <br />investigations, explorations, tests, reports and studies with the terms and conditions of the <br />Contract Documents. <br />7.6 CONTRACTOR has given ENGINEER written notice of all conflicts, errors or discrepancies <br />that he has discovered in the Contract Documents and the written resolution thereof by <br />ENGINEER is acceptable to CONTRACTOR. <br />7.7 Contractor is registered with and will use the Department of Homeland Security's E -Verify <br />system (www.e-verify.gov) to confirm the employment eligibility of all newly hired employees <br />for the duration of this agreement, as required by Section 448.095, F.S. Contractor is also <br />responsible for obtaining proof of E -Verify registration for all subcontractors. <br />ARTICLE 8 CONTRACT DOCUMENTS. <br />The Contract Documents which comprise the entire agreement between OWNER and <br />CONTRACTOR concerning the work consist of the following: <br />8.1 This Agreement (Section 00530). <br />8.2 Public Construction Bond (Sections 00610). <br />8.3 Notice of Award and Notice to Proceed (examples in Section 00800). <br />8.4 General Conditions (Section 00700). <br />8.5 Supplementary Conditions (Section 00800). <br />8.6 Specifications bearing the title "Phase 1 - Cell 3 Site Preparation Class 1 Landfill - <br />Seament 3 Expansion" as listed in the table of contents <br />00530-5 <br />