My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-009
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2023 12:45:19 PM
Creation date
7/6/2023 12:38:14 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/05/1999
Control Number
1999-009
Subject
Contract Documents & Specifications for Wabasso Causeway Park
Beautification Project. Arozoza Brothers
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8. CONTRA K FQRCE AND PERSONNEL: <br />The Contractor shall advise his forces and sub -contractors of the following controls: <br />A. Unruly behavior of Contractor personnel WILL NOT BE TOLERATED. Any <br />person employed by the Contractor who does not comport himself will be <br />removed from the site when requested by the Engineer and Owner. <br />B. No drinking of alcoholic beverages of any hind will be allowed on the project <br />site. <br />C. All traffic control and safety procedures shall be according to FDOT criteria. <br />9. TRAFFICfUTILiTIES AND PEDESTRIAN CONTRQI_,- <br />A. Parking of workmen's vehicles shall be coordinated with the Indian Diver <br />County Public Works Department Project Manager. <br />13. Any existing utilities at the site that are affected by construction operations <br />shall be maintained, protected and repaired/replaced by the Contractor, <br />10. FIELD OFFICES AND SUEDS: <br />The Contractor shall maintain his field office, sheds and storage areas on the site, <br />at locations approved by the Owner. <br />TECHNICAL SPECIFICATIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.