My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-009
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2023 12:45:19 PM
Creation date
7/6/2023 12:38:14 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/05/1999
Control Number
1999-009
Subject
Contract Documents & Specifications for Wabasso Causeway Park
Beautification Project. Arozoza Brothers
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />40 <br />d <br />rM <br />The Contractor shall bear the cost of providing, maintaining and operating any and <br />all temporary facilities. <br />M ■ r <br />Electrical power is available to the Contractor at the site via a temporary <br />construction meter. The Contractor will arrange and pay for temporary electrical <br />service from the local power company. <br />3. W—LIER-5-ERVIf €• <br />Temporary water required for irrigation purposes shall be obtained via a <br />construction meter tapped into existing water mains. Contractor shall be <br />responsible for obtaining a suitable source of water, and shall pay for all water <br />used. <br />4. TE L E P H 0 `JE SERVICE - <br />Not considered required for this project. If Contractor elects to have telephone <br />service at the job site, Contractor shall arrange and pay for temporary telephone <br />service. <br />5. ',MEb1,,5 -rolLET5 8ND pl I!•i�C14 FACECITIES: <br />The Contractor shall provide and maintain sufficient toilet facilities for his own and <br />sub -contractor forces, <br />6. BEOE1TL <br />A. The Contractor shall be responsible for maintaining his own security force, <br />in areas of new construction, by whatever means is required to project his <br />work and materials at the site. <br />B. Any security required by the Contractor shall be provided at his own <br />expense. <br />A. Physical barriers shall be installed by the Contractor between the areas of <br />construction at the site and the surrounding properties in such form as May <br />be required to insure the protections of life and property. <br />B. Barriers, controls security fencing and railings necessary for protection of <br />surrounding property shall be the responsibility of the Contractor and shall <br />be in conformance to local and state regulations as well as OSHA <br />Standards. 4 <br />TECHNICAL SPECIFICATIO 5 � <br />
The URL can be used to link to this page
Your browser does not support the video tag.