My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-009
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2023 12:45:19 PM
Creation date
7/6/2023 12:38:14 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/05/1999
Control Number
1999-009
Subject
Contract Documents & Specifications for Wabasso Causeway Park
Beautification Project. Arozoza Brothers
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40 <br />• <br />0 <br />illustrations, brochures, standard schedules, performance charts, instructions, diagrams and other <br />information prepared by a Supplier and submitted by CONTRACTOR to illustrate material or <br />equipment for some portion of the Work. <br />Specifications - Those portions of the Contract Documents consisting of written technical <br />descriptions of materials, equipment, construction systems, standards and workmanship as <br />applied to the Work and certain administrative details applicable thereto. <br />Subcontractor - An individual, firm or corporation having a direct contract with CONTRACTOR <br />or with any other Subcontractor for the performance of a part of the Work at the site. <br />Substantial Completion - The Work (or a specified part thereof) has progressed to the point <br />where, in the opinion of ENGINEER as evidenced by ENGINEER'S definitive certificate of <br />Substantial Completion, it is :sufficiently complete, in accordance with the Contract Documents, <br />so that the Work (or specified part) can be utilized for the purposes for which it is intended; or if <br />there be no such certificate issued, when final payment is due in accordance with paragraph <br />14.13. The terms "substantially complete" and "substantially completed" as applied to any Work <br />refer to Substantial Completion thereof. <br />Supplementary Conditions - The part of the Contract Documents which amends or supplements <br />these General Conditions. <br />Supplier- A manufacturer, fabricator, supplier, distributor, materialman or vendor. <br />Underground Facilities - All pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, <br />tunnels or other such facilities or attachments, and any encasements containing such facilities <br />which hsvR hpen installed underground to furnish any of the following services or materials; <br />electricity, gases, steam, liquid petroleum products, telephone or other communications, cable <br />television, sewage and drainage removal, traffic or other control systems or water. <br />Urrir r,riie Work - Work, to bs Void for of �� the basis of unit prices. <br />Work - The entire completed construction or the various separately identifiable parts thereof <br />required to be furnished under the Contract Documents. Work is the result of performing <br />services, furnishing labor and furnishing and incorporating materials and equipment into the <br />construction, all as required by the Contract Documents. <br />Work Directive Change - A written directive to CONTRACTOR, issued on or after the Effective <br />Date of the Agreement and signed by OWNER and recommended by ENGINEER, ordering an <br />addition, deletion or revision in the Work, or responding to differing or unforeseen physical <br />conditions under which the Work is to be performed as provided in paragraph 4.3 or to <br />emergencies under paravraph 6.27. A Work Directive Change may not change the Contract <br />Price -or the Contract Time, but is evidence that the parties expect that the change directed or <br />documented by a Work Directive Change will be incorporated in a subsequently issued Change <br />Order following negotiations by the parties as to its effect, if any, on the Contract Price or Contract <br />Time as provided in paragraph 14.2. <br />Written Amendmeni - A written amendment of the Contract Documents, signed by OWNER and <br />CONTRACTOR on or after the Effective Date of the Agreement and normally dealing with the <br />non -engineering or nontechnical rather than strictly Work-related aspects of the Contract <br />Documents. <br />GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.