My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-009
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2023 12:45:19 PM
Creation date
7/6/2023 12:38:14 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/05/1999
Control Number
1999-009
Subject
Contract Documents & Specifications for Wabasso Causeway Park
Beautification Project. Arozoza Brothers
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40 <br />CA <br />0 <br />11 <br />ARTIC4E 2 - PREMMINARY MATTE <br />Delivery of Bonds: <br />2.1 When CONTRACTOR delivers the executed Agreements to OWNER, CONTRACTOR <br />shall also deliver to OWNER such Bonds as CONTRACTOR may be required to furnish <br />in accordance with paragraph 5.1. <br />Copies of Documents: <br />2.2 OWNER shall furnish to CONTRACTOR up to ten copies (unless otherwise specified in <br />the Supplementary Conditions) of the Contract Documents as are reasonably necessary <br />for the execution of the Work. Additional copies will be furnished, upon request, at the <br />cncf of reproduction. <br />Commencement of Contract Time; Notice to Proceed; <br />2.3 The Contract Time will commence to run on the day indicated in the Notice to Proceed. <br />A Notice to Proceed may be given at any time after the effective date of the Agreement. <br />In no event will the Contract Time commence to run later than the seventy-fifth (75) day <br />after the day of Bid ripening. <br />Starting the Project: <br />2.4 CONTRACTOR shall start to perform the Work on the date when the Contract Time <br />commences to run, but no Work shall be done at the site prior to the date on which the <br />Confrar_.t Time commences to run. <br />Before Starting Construction: <br />2.5 Before undertaking each r art of the Work, CONTRAr';TnR shaft r:arr.,fillly study and <br />compare the CONTRACT Documents and check and verify pertinent figures shown <br />thereon and all applicable field measurements. CONTRACTOR shall promptly report in <br />writing to ENGINEER any conflict, error or discrepancy which CONTRACTOR may <br />discover and shall obtain a written interpretation or clarification from ENGINEER before <br />proceeding with any Work affected thereby; however, CONTRACTOR shall not be liable <br />to OWNER or ENGINEER for failure to report any conflict, error or discrepancy In the <br />Contract Documents, unless CONTRACTOR had actual knowledge thereof or should <br />reasonably have known thereof. <br />2.6 Within ten (10) days after the Effective Date of the Agreement (unless otherwise specified <br />in tho Gonoral Requirements), CONTRACTOR s;hail submit to ENGINEER for review.- <br />2.6.1 <br />eview:2.6.1 an estimated progress schedule indicating the starting and completion dates of the <br />various stages of the Work, <br />2.5.2 a preliminary schedule of Shop Drawing submissions; and <br />2.6.3 a preliminary schedule of values for all of the Work which will include quantities and <br />prices of items aggregating the Contract Price and will subdivide the Work into <br />component parts in sufficient detail to serve as the basis for progress payments <br />during construction. Such prices will include an appropriate amount of overhead a.• <br />and profit applicable to each itern of Work which will be confirmed in writing by <br />CONTRACTOR at the time of submission. <br />rA <br />rFrrr'RAr, ccwDrmrnNs <br />
The URL can be used to link to this page
Your browser does not support the video tag.