My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-009
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2023 12:45:19 PM
Creation date
7/6/2023 12:38:14 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/05/1999
Control Number
1999-009
Subject
Contract Documents & Specifications for Wabasso Causeway Park
Beautification Project. Arozoza Brothers
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40 <br />E13 <br />11 <br />0 <br />CONTRACTOR's representative at the site and shall have authority to act on behalf of <br />CONTRACTOR. All communications given to the superintendent shall be as binding as <br />if given to CONTRACTOR. <br />Labor, Materials and Equipment: <br />6.3 CONTRACTOR shall provide competent, suitable qualified personnel to survey and lay <br />out the Work and perform construction as required by the Contract 'Documents. <br />CONTRACTOR shall at all times maintain good discipline and order at the site. Except <br />in connection with the safety or protection of persons or the Work or property at the site <br />or adjacent thereto, and except as otherwise indicted in the Contract Documents, all Work <br />at the site shall be performed during regular working hours, and CONTRACTOR will not <br />permit overtime work or the performance of Work on Saturday, Sunday or any legal holiday <br />without OWN ER's written consent given after prior written notice to ENGINEER. <br />6,4 Unless otherwise specified in the General Requirements, CONTRACTOR shall furnish and <br />assume full responsibility for all material, equipment, labor, transportation, construction <br />equipment and machinery, tools, appliances, fuel power, light, heat, telephone, wager <br />sanitary facilities, temporary facilities and all other facilities and incidentals necessary for <br />the furnishing, performance, testing, start-up and completion of the Work. <br />6.8 All materials and equipment shall be of good quality and new, except as otherwise <br />provided in the Contract Documents. if required by ENGINEER, CONTRACTOR shall <br />furnish satisfactory evidence (including reports of required tests) as to the kind and quality <br />of materials and equipment. All material and equipment shall be applied, installed, <br />connected, erected, used, cleaned and conditioned in accordance with the instructions of <br />the applicable Supplier except as otherwise provided in the Contract Documents; but no <br />provision of any such instructions will be effective to assign to ENGINEER, or any of <br />ENGINEER's consultants, agents or employees, any duty or authority to supervise or <br />direct the furnishing or performance of the Work or any duty or authority to undertake <br />responsibility contrary to the provisions of paragraph 9.15 or 9.1.6_ <br />Adjusting Progress Scneduie: <br />6.6 CONTRACTOR shall submit to ENGINEER for acceptance (to the extent indicated in <br />paragraph 2.9) adjustments in the progress schedule to reflect the impact thereon of new <br />developments; these will conform generally to the progress then if effect and additionally <br />will comply with any provisions of the General Requirements applicable thereto. <br />Substitutes or "Or -Equal" Items: <br />8.7.1. Whenever materials or equipment are specified or described in the Contract Documents . <br />by using the name of a proprietary item or the name of a particular supplier, the naming <br />of fhn. itp.m i -q irlter ded to egtab!i zh fhA hine fi mr.tinn ane# ni ialifv rune iirc+ri and fn aefoWiSh <br />a basis for bidding. Unless the name is followed by words indicating that no substitution <br />is permitted, substitute materials or equipment may be reviewed by Engineer li sufficient <br />information is supplied by CONTRACTOR to allow Engineer to evaluate the proposed <br />substitution. The use of materials or equipment other than those named shall be <br />considered a substitution, which will be considered only after a contract for the Mork is <br />awarded. <br />6.7.2. If CONTRACTOR wishes to furnish or use a substitute item of material or equipment, <br />CONTRACTOR shall snake written application to Engineer for review thereof, certifying <br />that the proposed substitute will perform the functions and achieve the results called for <br />GENERAL CONDTT'TONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.