Laserfiche WebLink
ARM-19 f3 WARRANTY ANE)GUARANI • A D I PELT • C ECTI N <br />RE V CC ACE R <br />Warranty and Guarantee: <br />13.1 CONTRACTOR warrants and guarantees to OWNER and ENGINEER that all Work will <br />be in accordance witil the Contract Documents and will not be defective. 'Prompt notice <br />of all defects shall <br />be given to CONTRACTOR. All defective Work, whether or not in place, may be rejected, <br />corrected or accepted as provided in this Article 13. <br />Tests and Inspections: <br />13.3 CONTRACTOR shall give ENGINEER timely notice of readiness of the Work for all <br />required inspections or tests. <br />13.4 The OWNER will retain and pay for an independent rnaterials testing laboratory to <br />accomplish certain tests. The only tests to be provided by the OWNER shall be the int al <br />tests for density and thickness of backfill, stabilized subgrade, base course and asphaltic <br />concrete surfaces; bearing value of stabilized subgrade; and Portland cement concrete <br />cylinder tests. Subsequent tests required after the initial tests to verify compliance with <br />the Contract Documents in areas failing the first test shall be paid for by the <br />CONTRACTOR by back charge to subsequent applications for payment. All other tests <br />required in the Contract Document shall be provided by the CONTRACTOR. The <br />CONTRACTOR shall assume full responsibility therefor, pay all costs in connection <br />there%vi'l) and furnish ENGINEER the required certificates of inspection, testing or <br />approval. CONTRACTOR shall also be responsible for and shall pay all costs in <br />connection with any inspection or testing required in connection with OWNER's or <br />ENGINEER's acceptance of a Supplier of materials or equipment proposed to be <br />incorporated in the Work, or of materials or equipment submitted for approval prior to <br />CONI RAC I OR's purchase ihef uua ICP II iuv pct auo dd iii 'u is VVork. <br />13.5 All inspections, tests or approvals other than those required by laws or Regulations of any <br />public body having jurisdiction shall be performed by organizations acceptable to OWNER <br />and CONTRACTOR (or by ENGINEER if so specified). <br />13.6 If any Work (including the work of others) that is to be inspected, tested or approved is <br />covered without written concurrwnce of ENGINEER, it must, if requested by ENGINEER, <br />be uncovered for observation. Such uncovering shall be at CONTRACTOR's expense <br />unless CONTRACTOR has given ENGINEER timely notice of CONTRACTOR's intention <br />to cover the same and ENGINEER has not acted with reasonable promptness in response <br />tri cu irh7 nniirn <br />13.7 Neither observations by ENGINEER nor inspections, tests or approvals by others shall <br />re'+eve CONTRACTOR form CONTRACTOR's obligations to perform the Work in <br />accordance with the Contract Documr' nts. <br />Uncovering Worst; <br />13.8 If any Work is covered contrary to the written request of ENGINEER, it must, if requested <br />by ENGINEER, be uncovered for ENGINEER's observation and replaced at <br />CONTRACTOR's expense. <br />GENERAL CONDITIONS <br />