My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-010
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2023 1:28:21 PM
Creation date
7/6/2023 1:27:59 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
01/12/1999
Control Number
1999-010
Subject
Agreement with Southern Petroleum Systems (SPS) Construction of IRC
Fleet Fueling Facility
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
171 <br />40 <br />• <br />�0 <br />SSIMNG 1I# fE ISMIV+'IPlO1JS111T 9HiC[ 1957 <br />480 SOUTH EDGEwOOD AVENUE,32205, PO BOX 6746, 32236.6746, JACKSONVILLE, FLORIDA USA PHONE 404 384-1000 FAX 904 384.4404 <br />- MiAMI 305 5.58.0440 ORIAN00 407 481-9755 TAMPA 813 620.3300 <br />September 30, 1998 <br />Indian 'River County Fleet Fueling Facility <br />Attention: Mike Owens <br />4552 4VStreet <br />Vero Beach, Fl, 32960 <br />PROJECT: Indian River Counly Fleet Fueling Faculty <br />4552 41`I Street <br />Vero Beach, Florida <br />RI-: PROJECT PROPOSALIAGREEMENT <br />Dear Mr. Owens <br />We are pleased to submit this proposal to perforin the.eeope of work as described on the project plans <br />and specifications, and/or this proposal, which shall define the project scope of work. <br />CONSTRUCTION SCOPE OF WORK: <br />1.1 Obtain permits related to this scope of work - <br />1.2 Perform a preconstruction tank test ori three (3) existing tanks. <br />1.3 Remove three dispensers from the islands and blow back the product lines. <br />1.4 Remove and dispose of concrete ill IIIc following dimensions: (3 cacti) 2' x 2' around dispensers, <br />3'X 8' from the tanks to the vent risers, 16' x 26' from tank slab over the submerged pumps, and <br />3'x 30' between the dispensers. <br />1.5 Remove arm properly dispose of approximately 130 if. of steel product piping and 30 if- of steel <br />vent piping. <br />1.6 Furnish and insist] (3) fiberglass dispenser sumps in existing islands. <br />1.7 Furnish and install (3) fiberglass sumps around existing Submerged pumps. <br />i.8 Furnish and install 140 If of Western flexible product piping. <br />1.9 Furnish and Install 2" fiberglass underground piping with 2" galvanized vents. <br />2,4 Furnish labor, materials, and equipment to form and pour conixete, reinforced with #4 rebar, in <br />the dimensions and areas as remover) above. <br />2.1 Reuse existing islands and bumper post. <br />2,2 Finnish labor and materials to paint (12) bumper post, (3) islands, and (3) STP manhole covers - <br />2 ,3 <br />overs.2,3 Ciean up construction debris and trash from work performed by Southern Pelroleurn Systems. <br />Construction `Installation Lump Sum Amount............................................................................ $49,585. <br />ALTERNATES: <br />1. Close existing underground larks in plane. form and pour new above ground tank slabs. <br />Furnish and Install two (2) Modem Welding above. ground double wall steel lank% protected by <br />eighteen (18) , 6" x 6' hollards. Reuse existing STP's and Tepipe as above. Add $59,270.44 and <br />eight days to the hemp sum above, or a tntal of 5108,055.00. <br />,FRVINr, Olt IT I R(-)1 F11Af IN(116TPY 1,Iy{ c I01,J <br />
The URL can be used to link to this page
Your browser does not support the video tag.