4D <br />FA <br />• <br />Milo ()wens. <br />(xluber 1. 11198 <br />I R C rl.01 <br />,,9e 7 <br />2. Furnish and install three (3) Gasboy fuel dispensers and a Veeder Root fuel lank monitor to the <br />above ground lank system, add $25,152.Oft. <br />NOTES: <br />1. Time of Construction; The estimated time of construction for the scaled scope of woO, Is (i 1) <br />working days from the date of commencement of work on the project, subject to rain delays <br />and/or other conditions not under the control of Southern Petroleum Systems. <br />2. Plans/Specificaltons: An amount of $0.00 for plans and specifications is Include(] in chis <br />proposal, Any additional cost for required plans and/or specifications shall be an extra cost to the <br />proposed price. <br />3. Permits: An allowance of $3OO.00 Is included in this proposal for permits. Any addilional cost <br />for obtaining the required permils shall be an extra cost to the proposed base price. <br />4. Exhibits "A" and W are attached to, and made a part of, this proposal. <br />5. This proposal is limited to the quantity of materials listed in the attached Construction Materials <br />Requirement Schedule; additional materials may result in an increase In the contract amount. <br />6. The concrete being ietnoved and replaced is jiasd uti up lu $" drive stab thickness and an 8" <br />tank slab thickness, using the specified area measurements above; addilionat thickness or sizing <br />of the slabs may result in an increase in the contract amount. <br />7. Prior to tank removal, it is the owner's responsibility to have the tanks pumped empty of product_ <br />a. Contaminated Wafer/Soil: This quotation does not include the removal andlur disposal of <br />contaminated water and/or contaminated soils, and if required, contaminated water and/or <br />contaminated soils witl be removed of and disposed of per Florida Department of EnvlronrnPntat <br />Protection specifications and regulations for an additional charge based upon a unit cost per <br />gallon or unit cost per cubic yard, including transportation. <br />9. Tank Excavation Backfill: This proposal assumes use of existing o site fill materials. Additional <br />backfill materials, if required, will be provided per unit cost schedule. <br />10. Dewatering: Provisions for dewatering are not included In this proposal. Should dewatering be <br />required, cost will be on a time and material basis with cost submitted under separate hid. <br />11. Soils from existing tank farm are assumed to be uncontaminated and can be reused, <br />12. The cost of sheet piling, if required, is net included in this quote. <br />13. Asphalt repairs will be done by Owner. <br />14. Start tip of new or existing equipment will be performer) by SPS'S service department on a time <br />and material basis. <br />15. SPS will provide an electrician to perforin the work contnined in notes. <br />