My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-011
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2023 1:34:59 PM
Creation date
7/6/2023 1:33:57 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
01/12/1999
Control Number
1999-011
Subject
Agreement with Southern Petroleum Systems (SPS)
Retrofit Sheriff's Fuel System
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ w <br />-SOUTHEHN.PETHULEUM SYSTEMS.:SERVING THE PETROLEUM INDUSTRY SINCE 1953 <br />2016 STANHOME WAY, ORLANDO, FLORIDA 32804 PHONE 407 481-9755 FAX 407 481-9722 <br />JACKSONVILLE 904 384-1000 MIAMI 305 558-0440 TAMPA 813 620-3300 <br />January 5, 1999 <br />M� Lynn Williams <br />Indian River County Sheriff's Office <br />4552 415' Street <br />Vero Beach, FL 32967 <br />PROJECT: Indian River County Sheriff's Office <br />4552 415' Street <br />Vero Beach, FL <br />RE: PROJECT PROPOSAUAGREEMENT — JOB # OCP4936 <br />Dear M. Williams: <br />----.� the „f k as described on the <br />We are pleased to ei.iuriiii this prDNuaBi to p^cnurin uic scDpa .. ..Dry A� ..�� <br />project plans and specifications, and/or this proposal, which shall define the project scope of <br />work. <br />CONSTRUCTION SCOPE OF WORK: <br />1.1 Obtain permits related to this scope of work. <br />1.2 Furnish DEP reports for tank removal, tank installation and piping. <br />1.3 Remove two (2) dispensing units from islands and set aside for reuse. <br />1.4 Sawcut over product lines from STP to dispenser. Remove and dispose of partial <br />concrete/asphalt tank and/or drive slabs assumed to be 6 inches thick and 3 x 20 arid 3 <br />x 30. A total of 150 S.F. <br />1.5 Remove and dispose of four (4) tanks (1-1,000 gallon, 1-550 gallon, 2-275 gallon) <br />1.6 Remove and dispose of or cap and abandon in place approximately 60 L.F. of <br />fiberglass fuel lines. <br />1.7 Remove and dispose of or cap and abandon in place approximately 70 L.F. of steel <br />vent lines. <br />1.8 Perform tank and piping closure per FDEP guidelines on UST's and lines removed. <br />1.9 Reuse existing two (2) 10,000 gallon fuel tanks. <br />2.0 Furnish and install 1-1,000 gallon AST Ecovault tank, 1-550 gallon AST EcovaLlt timin;,<. <br />2-275 gallon AST Ecovault tank. <br />2.1 Furnish and install up to 20 tons of sand backfill material. <br />2.2 Furnish and install two (2) OPW 61FSTOP drop tubes. <br />SERVING TI!L PETROLEUM INDUSTRY SINCE 1953 <br />
The URL can be used to link to this page
Your browser does not support the video tag.