My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-011
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2023 1:34:59 PM
Creation date
7/6/2023 1:33:57 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
01/12/1999
Control Number
1999-011
Subject
Agreement with Southern Petroleum Systems (SPS)
Retrofit Sheriff's Fuel System
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40 <br />e <br />• <br />E <br />OPC-4936 <br />1/5199 <br />irc shenff s Off— <br />Page 2 <br />2.3 Furnish and install two (2) Vaporless leak detectors. <br />2.4 Furnish and install two (2) 42 inch Pemco STP manholes. <br />2.5 Furnish and install two (2) Red Jacket % HP submerged pumps. Provide two (2) new <br />control boxes. <br />2.6 Furnish and install two (2) poly type STP sumps <br />2.7 Furnish and install two (2) poly type dispenser sumps. <br />2.8 Furnish and install four (4) post bumper guards 6" outside diameter x 6'6" length. <br />2.9 Furnish and install I inch d0 ihlewall dirpr_.t Miry flexihlP nrMUC_.t nine. <br />3.0 Furnish and install black steel above ground for the gasoline dispensers on the AST's. <br />3.1 Perform post -construction precision test on two (2) tanks, two (2) product lines. <br />3.2 Form and pour a 10'x 12'x 6" inch concrete tank slab. <br />3.3 Form and pour a 20' x 3' x 6" trench. <br />3.4 Reuse existing island and/or bumper guards. <br />3.5 Furnish labor and materials to paint four (4) bumper posts. <br />3.6 Clean up construction debris and trash from work performed by Southern Petroleum <br />Systems. <br />Construction Lump Sum Amount ................................................. $ 77,836.00 <br />NOTES: <br />1. Time of Construction: The estimated time of construction for the stated scope of work <br />is ( 16 ) working days from the date of commencement of work on the project, subject <br />to rain delays and/or other conditions not under the control of Southern Petroleum <br />Systems. <br />2. Plans/Specifications: An amount of $0.00 for plans and specifications is included in <br />this proposal. Any additional cost for required plans and/or specifications shall be an <br />extra cost to the proposed price. <br />3. Permits: An allowance of $400.00 is included in this proposal for permits. Any <br />additional cost for obtaining the required permits shall be an extra cost to the proposed <br />base price. <br />4. Exhibit "A" is attached to, and made a part of, this proposal. <br />5. This proposal is limited to the quantity of materials listed in the attached Work Scope, <br />additional materials may result in an increase in the contract amount. <br />6. Prior to tank removal, it is the owner's responsibility to have the tanks pumped empty of <br />all materials to within one inch of tank bottoms. <br />7. Contaminated Water/Soil: This quotation does not include the removal and/or disposal <br />of contaminated water and/or contaminated soils, and if required, contaminated water <br />and/or contaminated soils will be removed of and disposed of per Florida Department <br />of Environmental Protection specifications and regulations for an additional charge <br />based upon a unit cost per gallon or unit cost per cubic yard, including transportation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.