Laserfiche WebLink
OPC-4936 <br />1 /5/99 <br />irc Sheriffs Office <br />Peg. 3 <br />8. Tank Excavation Backfill: This proposal assumes use of existing on site fill materials. <br />Additional backfill materials, if required, will be provided per unit cost schedule. <br />p. Dewatering: Provisions for dewatering are not included in this proposal. Should <br />dewatering be required, cost will be on a time and material basis with cost submitted <br />under separate bid. <br />10, Soils from existing tank farm are assumed to be uncontaminated and can be reused. <br />11. All soils excavated and not utilized during installation will be disposed of by others. <br />12. The cost of sheet piling, if required, is not included in this quote. <br />13. Asphalt repairs will be done by Owner. <br />14. SPS will provide an electrician to perform the work contained in proposal. <br />Thank you for your consideration of Southern Petroleum Systems Incorporated, and we look <br />forward to the possibility of working with you for the successful completion of this project. If you <br />.have any questions, please feel free to contact us. <br />Cordially, <br />SOUTHERN PETROLEUM SYSTEMS <br />flVa <br />Brad Walters <br />Sales/Project Manager <br />In <br />Dy. -• , r.. rvinya I <br />Title: CHAIRMAN <br />Date: ll/a/9 9 _ <br />Approval/Acceptance By SPS Authorized Officer <br />Approved Approved as Noted Date: <br />111103 <br />