My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-029
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-029
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2024 2:03:13 PM
Creation date
7/10/2023 9:55:28 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
01/26/1999
Control Number
1999-029
Entity Name
Florida Institute of Technology
Subject
Agreement /IRC & FIT, Melbourne. Calibration & Application of a Three
Dimensional Numerical Model for PEP Reef Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40 <br />8 <br />4.1 Model Training Workshop <br />A workshop will be conducted at IRC offices to train engineering personnel in <br />procedures for EFDC model setup including grid generation, data input to force the <br />model, model calibration and application procedures, and examples of graphic <br />presentation of model output. Workshop participants will be provided with a model <br />nci r°e l pn;—tinn fh..f n r Ln -.d f- <br />5.0 . <br />5.0 Project Tasks <br />Task I: Data assembly including wave, current and water level data from existing <br />monitoring stations. <br />Task 2: Acquire sediment distribution from within the project area. Analysis of sediment <br />to set sediment characteristics in the model. Sediment data to be supplied by <br />the IRC. <br />Task 3: Model re-formulation to accommodate calculation of wave forces on a finer <br />subgrid and interaction of the wave model with the main circulation/sediment <br />transport model. <br />Task 4: Model set-up at the project site and testing prior to calibration runs. This task <br />includes model grid generation, setup of input files, and development of software <br />to process model output for graphical presentation <br />Task 5: Calibration runs of the model to optimize the comparison between measured and <br />predicted wave parameters, current velocity and water level changes, and <br />topography in the project area. <br />Task G: Production runs to simulate wave transmission and sediment transport in the PEP <br />Reef area and control areas to the north and south of the observed and predicted <br />topographic change. <br />Task 7: Final report and users guide describing model formulation/setup, calibration and <br />the predicted performance of the PEP Reef. <br />Task 8: Model workshop conducted at the Indian River County Office. <br />
The URL can be used to link to this page
Your browser does not support the video tag.