My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-039
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-039
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2023 10:57:38 AM
Creation date
7/10/2023 10:57:19 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/09/1999
Control Number
1999-039
Subject
Contracts between IRC & ZEP Construction
CR 512 Bridge Replacement Project/Park Lateral Canal & Lateral AU@ Canal
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of any instruction received from the COUNTY would cause a violation of any applicable <br />En law, the DESIGN/BUILDER shall notify the COUNTY in writing. Neither the <br />UMAJN/bUILDBR nor the DESIGNBUILDER'S engineer shall be obligated to perform <br />any act which either believes will violate any applicable law. <br />E. The DESIGNBUILDER shall construct the bridges using reasonable and accepted <br />construction means and equipment. <br />SECTION III - COUNTY OBLIGATIONS <br />The COUNTY agrees to provide the following material, data, or services as required in <br />connection with the work to be performed under this Agreement: <br />A. Provide the DESIGNBUILDER with a copy of any preliminary data or reports <br />available. <br />B. Provide the DESIGNBUILDER with all available drawings, and other documents <br />in the possession of the COUNTY pertinent to the project. <br />C. The COUNTY shall be responsible for acquiring all right-of-ways, easements and <br />other rights in land as necessary to complete the project. <br />D. The COUNTY shall be responsible for obtaining those permits required to perform <br />the work to complete the project only if such permit requirements are established by <br />regulatory agencies after the date of this Agreement. <br />E. The COUNTY shall make provisions for the DESIGN/BUILDER to enter upon <br />public or private property as required for the DESIGN/BUILDER to perform his <br />services. If private property access is required, the Design/Builder must identify the <br />need under the Preliminary Design Phase. <br />F. The COUNTY will promptly execute all permit applications prepared by the <br />DESIGN/BUILDER necessary to expedite the acquisition of any local, state or <br />federal permits made necessary by the project. <br />G. The COUNTY will provide survey and topo drawings, where necessary. <br />H. The COUNTY designates Tames 11. Davis, P.E., Public Works Director, as Project <br />�__:._ _1 <br />Manager for the Project or his designee. <br />SECTION IV - SCOPE OF SERVICES <br />The DESIGNBUILDER agrees to perform professional services in connection with the <br />project as required and as set forth in the following: <br />A. _Qeneral <br />1 . The DESIGN/BUILDER will endeavor not to duplicate any previous work <br />done on the project. After written authorization to proceed, the DESIGNBUILDER shall consult <br />with the COUNTY staff to clarify and define the COUNTY'S requirements for the project and <br />review all available data after which a meeting with the Fellsmere Farms Water Control District, <br />City of Fellsmere, and Sun Ag will be held and attended by the DESIGNBUILDER and County <br />staff. <br />2. The DESIGNBUILDER will attend conferences with the COUNTY and its <br />representatives upon the request of COUNTY. <br />3. In order to accomplish the work described under this Agreement in the time <br />frames and under the conditions set forth in this Agreement, the DESIGN/BUILDER will observe <br />the following requirements: <br />a. The DESIGN/BUILDER will completehiswork onthe project within <br />the time allowed by maintaining an adequate staff of registered Engineers, draftsmen, <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.