My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-039
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-039
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2023 10:57:38 AM
Creation date
7/10/2023 10:57:19 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/09/1999
Control Number
1999-039
Subject
Contracts between IRC & ZEP Construction
CR 512 Bridge Replacement Project/Park Lateral Canal & Lateral AU@ Canal
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
environmental scientists, and other employees on the work at all times. The DESIGNBUILDER <br />® will retain the services of an approved Environmental Engineer and/or Biologist approved by the <br />COUNTY to provide environmental services regarding wetlands, endangered species, <br />• contamination, etc., if necessary. <br />By executing this Contract, the DESIGNBUILDER represents to the <br />COUNTY that the DESIGNBUILDER is professionally qualified to act as the ENGINEER for the <br />project and is licensed to practice ENGINEERING by all public entities having jurisdiction over the <br />DESIGNBUILDER and the project, or will subcontract with a qualified registered Florida <br />ENGINEER approved by the COUNTY. The DESIGNBUILDER further represents to the <br />COUNTY that the DESIGNBUILDER will maintain all necessary licenses, permits or other <br />authorizations necessary to act as ENGINEER, Contractor, and other disciplines for the Project until <br />DESIGNBUILDER's remaining duties hereunder have been satisfied. The DESIGNBUILDER <br />assumes full responsibility to the COUNTY for the improper acts and omissions of its consultants <br />or others employed or retained by the DESIGNBUILDER in connection with the Project <br />The professional services are to be provided in accordance with <br />generally accepted professional engineering and construction practices: <br />Nothing contained in this agreement shall create a contractual <br />relationship with or a cause of action in favor of a third party against either the COUNTY or the <br />DESIGNBUILDER. <br />Execution of this Contract by the DESIGNBUILDER constitutes a <br />representation that the DESIGNBUILDER has become familiar with the Project site and the local <br />conditions under which the Project is to be implemented. <br />b. The DESIGNBUILDER will comply with all federal, state, and local <br />laws applicable to this project. The DESIGNBUILDER will design and build the project in such <br />a manner as to be in conformance with all applicable federal, state and local laws, including the <br />policies of the Fellsmere Farms Water Control District. <br />C. The DESIGNBUILDER will prepare all necessary sketches and <br />completed application forms to accompany the COUNTY'S applications for any required federal, <br />state, or local permits. <br />d. The DESIGNBUILDER will cooperate fully with the COUNTY in <br />order that all phases of the work may be properly scheduled and coordinated. <br />e. The DESIGNBUILDER will submit a preliminary set ofconstruction <br />plans to any city, district, county, state or federal regulatory agency from which a permit or other <br />approval is required prior to final approval of the design by the Director of the Public Works <br />Department. <br />f. The DESIGNBUILDER will contact all utility companies having <br />installations in the vicinity of the proposed work and notify said companies of the time schedule for <br />construction of the project and relocation of utilities, if any. Electrical Services relocation will also <br />be coordinated by the DESIGNBUILDER. The DESIGNBUILDER will provide the COUNTY <br />with necessary information relative to required utility adjustments or relocations and will show the <br />relocated utilities on the final design plans. The DESIGNBUILDER shall design all utility <br />extensions required to support the project, if necessary. <br />g. The DESIGNBUILDER shall report the status of this project io the <br />Director of the Public Works Department upon request and hold all drawings, calculations and <br />related work open to the inspection of the Director or his authorized agent at any time, upon <br />reasonable request. <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.