My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-040
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-040
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2023 11:02:03 AM
Creation date
7/10/2023 11:01:57 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
02/09/1999
Control Number
1999-040
Entity Name
Carter & Associates, Inc.
Subject
Work Order 2/Professional Service Agreement IR City Stormwater Improvements
Carter & Associates, Inc. East Roseland Watershed North of Sebastian, East of Gibson
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a <br />Indian River County I/ A/ <br />Task 01- Roseland Area Stormwater Improvements 9 t) , D q b <br />df <br />WORK ORDER NO. 2 TO THE PROFESSIONAL <br />UIVIL SERVICES MASTER AGREEMENT <br />® BETWEEN CARTER AND ASSOCIATES, INC., <br />DATED AUGUST 4,1998 AND <br />INDIAN RIVER COUNTY, FLORIDA. <br />Pursuant to the Professional Services Agreement dated August4,1998, by and between Indian River <br />County, apolitical subdivision of the State of Florida, hereinafter referred to as the COUNTY, and CARTER <br />AND ASSOCIATES, INC., VERO BEACH, FLORIDA, hereinafter referred to as the ENGINEER, this <br />Work Order No. 2 is an extension of and hereby becomes apart of the MASTER AGREEMENT as follows: <br />SECTION 1 - PROJECT LIMITS AND DESCRIPTION <br />The Roseland Area Stormwater Improvement Project will provide flood control and stormwater <br />quality treatment fora portion of Roseland lying primarily east of the FEC Railroad including tributary areas <br />west of the Railroad. The limits of the work is the east Roseland Watershed north of the City of Sebastian, <br />east of Gibson Street, south of the St. Sebastian River, and west of US 1, including connecting tributaries. <br />SECTION H - COUNTY OBLIGATIONS <br />The COUNTY agrees to provide the ENGINEER with the following material, data or services as <br />required in connection with the work to be performed under this Agreement: <br />A. Currently available drainage studies, survey drawings, plans, calculations and other data <br />pertinent to the project. <br />B. Title information and title opinion relating to land necessary for the project. <br />C. Landowner authorizations to inspect the site(s) with jurisdictional agencies to determine <br />existing environmental conditions. <br />D. Landowner negotiations to acquire easements and/or right-of-way necessary for the project. <br />E. Property appraisal information for areas of potential acquisition. <br />F. Soils testing as required, under the direction of the ENGINEER. <br />SECTION III - SCOPE OF SERVICES <br />A. The ENGINEER will perform all necessary environmental investigation, engineering <br />design, surveying, drainage design, permitting, and incidental work for the drainage and <br />related improvements to the east Roseland Area Stormwater Improvement project. <br />Detailed Plans and Specifications shall be prepared so that the construction can be properly <br />bid. The ENGINEER will prepare complete permit applications to St. Johns River Water <br />Management District(SJRWMD), Florida Department of Environmental Protection(FDEP), <br />US Army Corps of Engineers(USACOE), and Environmental Protection Agency(EPA), for <br />the COUNTY's signature. <br />B. After issuance of a work order and written authorization to proceed, the ENGINEER shall <br />consult with the COUNTY to clarify and define theCOUNTY's requirements and objective <br />for the project, and review all available data. <br />C. The ENGINEER will strive to complete his work on the PROJECT within the time allowed <br />by maintaining an adequate staff of registered engineers, biologists, draftsmen, and other <br />employees on the work at all times. <br />D. The ENGINEER shall report the status of this project to the Director of Public Works <br />Department upon request and hold all drawings, calculations and revised work open to the <br />inspection of the Director or his authorized agent at any time, upon reasonable request. <br />E. ITEMIZED WORK <br />TASK 01 - PROJECT DEFINITION <br />The ENGINEER will assemble all available surveys and information from the COUNTY <br />which is associated with this project. The ENGINEER will prepare a conceptual design of <br />
The URL can be used to link to this page
Your browser does not support the video tag.