<br />SECTION 01025
<br />MEASUREMENT AND PAYMENT
<br />PART 1 -- GENERAL
<br />1.01
<br />1.02
<br />1.03
<br />GENERAL
<br />(UGCO1025.FMT):aa
<br />Measurement and payment will be based upon work completed
<br />and accepted in accordance with the Contract Documents.
<br />No separate payment will be made for excavation,
<br />trenching, dewatering, backfilling, leakage tests,
<br />surveying, density tests, or other incidental items of
<br />work not shown in the Agreement.
<br />EQUIPMENT AND MATERIALS IN STORAGE
<br />Partial payment. for materials and equipment in proper
<br />storage at the site of the work or other approved storage
<br />site will be made for those items for which the
<br />Contractor has submitted paid invoices to the Engineer.
<br />The partial payment for stored materials will be 50% of
<br />the value of materials and equipment, based on receipted
<br />bills, furnished but not incorporated in the work, as
<br />determined by Engineer.
<br />MEASUREMENT
<br />A. Mobilization: Measurement shall be on a lump sum
<br />basis, and shall be limited to the following
<br />maximum amounts:
<br />ORIGINAL
<br />CONTRACT AMOUNT
<br />MAXIMUM AMOUNT OE
<br />FROM MORE THAN
<br />TO ANDNCLUDING
<br />ITEM FOR MOBILIZATION
<br />0
<br />100,000
<br />3,000
<br />100,000
<br />500,000
<br />1.5,000
<br />500,000
<br />1,000,000
<br />3U,000
<br />1,000,000
<br />2,000,000
<br />60,000
<br />2,000,000
<br />3,000,000
<br />90,000
<br />3,000,000
<br />4,000,000
<br />120.000
<br />4,000,000
<br />5,000,000
<br />125,000
<br />5,000,000
<br />6,000,000
<br />150,000
<br />6,000,000
<br />7,000,000
<br />175,000
<br />7,000,000
<br />10,000,000
<br />200,000
<br />10, 000, 000
<br />--------------
<br />250,000
<br />01025-1