Laserfiche WebLink
4W <br />4W <br />should the lump sum price bid for the item <br />Mobilization exceed the maximum permissible amount <br />for this item, as specified herein, the bid price <br />will be reduced,to the maximum permissible amount, <br />and the reduced price will be used in correctly <br />determining the total price for comparison of bids <br />received. <br />f. Pipe: Pipe will be measured along the centerline <br />of the pipe installed. No deduction will be made <br />for the length of valves and fittings installed in <br />the line. Where the measurement terminates at a <br />valve, bend, tee, or other fitting, the centerline <br />of the valve or fitting shall be the point of <br />termination. All required pipe lining, coating, <br />encasement material, restraining devices, and <br />thrust blocks shall be included in the cost of the <br />pipe. <br />C. Fittings: Measurement of cast iron and ductile <br />iron fittings shall be on the basis of weight. The <br />weights used to determine the quantity installed <br />shall be the weights of the appropriate fittings as <br />listed in the supplier's invoice or catalog. When <br />mechanical joint fittings are required, the weight <br />of the gland bolts and gaskets shall not be added. <br />to the listed weight of the fittings. Where <br />fl.anged fittings are furnished, the weight of the <br />bolts and gaskets shall not be included. <br />D. Plug Valves and Tapping Valves: Measurement shall <br />be on the basis of furnishing and installing each <br />type and size of valve (and tapping sleeve, if <br />applicable) required, including the valve box, <br />cover, and other associated items. <br />F. Concrete Sidewalk and Driveway Replacement; <br />Measurement of concrete for sidewalk and driveway <br />replacement shall be computed using the linear <br />feet, as measured along the pipe, or sidewalk <br />and/or driveway removed and replaced as a result of <br />Contractor's operations. Minimum widths of <br />replacement shall be as described in specifications <br />or as shown on the plans. No separate payment will <br />be made for sawcutting, excavation, formwork, <br />reinforcing, or other work or materials required in <br />connection with concrete construction. <br />F. Concrete Encasement: Measurement of concrete for <br />encasement shall be on the basis of the number of <br />01025-2 <br />