My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-049
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-049
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2023 10:10:37 AM
Creation date
7/12/2023 9:54:22 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Miscellaneous
Approved Date
02/16/1999
Control Number
1999-049
Entity Name
Driveways Inc.
Subject
Cherrywood Estates Water Expansion Project# 98-05-DS
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40 <br />(UGCO1060,FMT);aa <br />{ <br />SECTION 01060 <br />REGULATORY REQUIREMENTS AND NOTIFICATION <br />PART 1 w GENERAL <br />1.01 PERMITS REQUIRED <br />A. Florida Department of Environmental Protection: <br />The general permit from the Florida Department of <br />Environmental Protection (FDEP) for the project is <br />being obtained. <br />B. INDIAN RIVER COUNTY: The Contractor, along with <br />the Utilities Department, must obtain right--of-way <br />permit(s) from Indian River County prior to <br />initiating construction. It typically requires one <br />week processing time to receive a right-of-way <br />permit. There is no processing fee for the permit. <br />One set of construction plans must be submitted <br />along with a permit application to the Indian River <br />County Engineering Department. The conditions of <br />the County right-of-way permits are as follows: <br />1. Applicant shall not begin construction of any <br />kind in the County right-of-way prior to <br />application and issuance of a valid permit by <br />Indian River County. <br />2. Any area disturbed in the County right-of-way <br />must be restored by applicant to a condition <br />equal to or better than existing just prior to <br />construction, including but not limited to <br />compaction, grading, paving, seeding and <br />mulching, sodding, etc., as the case may be. <br />The quality of construction, materials, and <br />workmanship shall be in accordance with County <br />standards. All disturbed areas shall be <br />restored within 48 hours after excavation. <br />3. Applicant shall notify the County Engineering <br />Division at least 48 hours prior to the <br />placement of concrete, paving of asphalt, <br />installation of culverts, or backfilling of <br />trenches, so that the County may inspect <br />installations as necessary. Applicant shell <br />further notify the County in writing of its <br />request for final inspection and approval at <br />the completion of the permitted activity. <br />01060--1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.