Laserfiche WebLink
• <br />C> <br />surface structures shall be replaced or repaired at the <br />expense of the Contractor to a condition equal to that <br />before work began within a time frame approved by the <br />Engineer. <br />END of SEcrloN <br />01025-d <br />