2. At completion of the change, Engineer will <br />determine the cost of such work based on the <br />unit prices and quantities used. <br />a. Contractor shall submit documentation to <br />establish the number of units of each <br />item and any claims for a change in <br />Contract Time, <br />3. Engineer will sign and date a second Change <br />Order to establish the change in Contract sum <br />and in contract Time. <br />4. Owner and Contractor will sign and date the <br />second Change Order to indicate their <br />agreement with the terms therein. <br />1.14 TIME AND MATERIAL/FORCE ACCOUNT CHANGE ORDER/ CONSTRUCTION <br />CHANGE AUTHORIZATXON <br />A. <br />Engineer and owner will issue a Work Directive <br />Change directing Contractor to Proceed with the <br />changes on a time-and-material/force account basis. <br />B. <br />At completion of the change, contractor shall <br />submit itemized accounting and supporting data as <br />provided in the Article "Documentation of Proposals <br />and Claims" of this section. <br />C. <br />Engineer will determine the allowable cost of such <br />work, as provided in General conditions and <br />Supplementary conditions. <br />D. <br />Engineer will sign and date the Change Order to <br />establish the change in Contract Sum and in <br />Contract Time. <br />E. <br />owner and Contractor will sign and date the Change <br />order to indicate their agreement therein. <br />1.11 CORRELATION <br />WITH CONTRACTOR'S SUBMITTALS <br />A. <br />contractor shall periodically revise Schedule of <br />Values and Request for Payment forms to record each <br />change as a separate item of Work, and to record <br />the adjusted contract Sum. <br />B. <br />contractor shall periodically revise the <br />Construction Schedule to reflect each change in <br />�.. <br />Contrac L. Time. <br />1. Revise subschedules to show Changes for other <br />items of work affected by the changes. <br />01153-5 <br />