Laserfiche WebLink
0 <br />1.08 LUMP <br />SUM/FIXED PRICE CHANGE ORDER <br />A. <br />Content of Change orders will be based on either: <br />1. Engineer's Proposal Request and Contractor's <br />responsible Proposal as mutually agreed upon <br />between owner and Contractor. <br />2. Contractor's Propos-al for a change, as <br />recommended by Engineer, <br />B. <br />owner and Engineer will sign and date the Change <br />Order as authorization for the Contractor to <br />proceed with the changes. <br />C. <br />Contractor shall sign and date the Change Order to <br />indicate agreement with the terms therein. <br />1.09 UNIT <br />PRICE CHANGE ORDER <br />A. <br />Content of Change orders will be based on, either: <br />1.. Engineer definition of the scope of the <br />required changes. <br />2. Contractor's Proposal for a change, as <br />recommended by Engineer. <br />3. survey of completed work. <br />B. <br />The amount of the unit prices shall be: <br />1. Those stated in the Agreement. <br />2. Those mutually agreed upon between Owner and <br />Contractor. <br />C. <br />When quantities of each of the items affected by <br />the Change order can be determined prior to start <br />of the work: <br />1. owner and Engineer will sign and date the <br />Change Order as authorization for Contractor <br />to proceed with the changer:. <br />2. Contractor shall sign and date the Change <br />order to indicate agreement with the terms <br />therein. <br />D. <br />When quantities of the items cannot be determined <br />prior to start of the work: <br />1. Engineer or owner will issue a Change Order <br />directing Contractor to proceed with the <br />change can the basis of unit prines, and will <br />cite the applicable unit prices. <br />❑1153-4 <br />