Laserfiche WebLink
• <br />i <br />for each unit price which has not previously been <br />established, with sufficient substantiating data to <br />allow Engineer to evaluate the quotation. <br />B. on request, provide additional data to support time <br />r- and cost computation including the following: <br />I. Labor required. <br />2. Equipment required. <br />3. Products required.. <br />a. Recommended source of purchase and unit <br />cost. <br />b. Quantities required. <br />4. Taxes, insurance bonds. <br />5. Credit for work deleted from Contract, <br />similarly documented. <br />G. [overhead and profit. <br />7. Justification for any change in.Contract Time. <br />C. Support each claim for additional costs, and for <br />work done on a time-and-material/force account <br />basis, with documentation as required for a lump <br />sum proposal, plus the following additional <br />information: <br />1. Name of the owner's authorization agent who <br />ordered the work, and date of the order. <br />2. Bates and times work performed, and by whom. <br />3. Time record, summary of hours worked, and <br />hourly rates paid. <br />4. Receipts and invoices for: <br />a. Equipment used, listing dates and times <br />of use. <br />b. Products used, listing quantities. <br />C. subcontracts, <br />D. Document requests for substitutions for Products as <br />specified in section 01600. <br />1.07 PREPARA`T`ION OF CHANGE ORDERS <br />A. Engineer will prepare each Change order. <br />B. Form: Change order format provided in the Contract <br />Documents. <br />C. Change Order will describe changes in the Work, <br />both additions and deletions, with attachments of <br />revised Conti:a t Doculllellts to define details of <br />change. <br />D. Change Order will provide an accounting of the <br />adjustment in the Contract Sum and in the Contract <br />�• Time. <br />41153-3 <br />