My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-049
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-049
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2023 10:10:37 AM
Creation date
7/12/2023 9:54:22 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Miscellaneous
Approved Date
02/16/1999
Control Number
1999-049
Entity Name
Driveways Inc.
Subject
Cherrywood Estates Water Expansion Project# 98-05-DS
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C-1 <br />i <br />r <br />(UGC013ll.FMT):aa <br />SECTION 01311 <br />CONSTRUCTION SCHEDULES <br />z <br />FART 1 _ GENERAL <br />1.01 REQUIREMENTS INCLUDED <br />A. Promptly after award of the Contract, Contractor <br />shall prepare and submit to the Engineer estimated <br />construction ,progress for the 'Work, with <br />subschedules of related activities which are <br />essential to its progress. <br />B. Coordinate the work and scheduling with and around <br />other contractors and individual trades performing <br />work on the Project. <br />C. Submit revised progress schedules with each <br />application for payment. <br />D. Progress Schedule shall become part of Contract <br />Documents after approval by Engineer. <br />1.02 RELATED REQUIREMENTS <br />A. In other parts of the Contract Documents: <br />1. General Conditions: <br />a. Articles 2 and 6 Schedules, Reports, <br />and Records <br />b. Sections 6.1 and 6.2 - Supervision by <br />Contractor <br />C. Article 15 - Supervision of Work, <br />Termination, and Delay <br />B. Specified in other sections: <br />1. Section 01000: Description of Work <br />2. Section 01201: Preconstruction Conference <br />3. Section 01340; Shap Drawings, Product Data, <br />and Samples <br />1.03 FORM OF SCHEDULES <br />A. prepare schedules in the form of a 'horizontal bar chart <br />as follows: <br />01311-1 <br />