My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-049
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-049
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2023 10:10:37 AM
Creation date
7/12/2023 9:54:22 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Miscellaneous
Approved Date
02/16/1999
Control Number
1999-049
Entity Name
Driveways Inc.
Subject
Cherrywood Estates Water Expansion Project# 98-05-DS
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40 <br />C7 <br />01311--2 <br />1. Provide separate horizontal bar for each trade <br />or operation <br />C' <br />2. Horizontal time scale: Identify the first <br />work day of each week <br />3. Scale and spacing: To allow space for <br />{ <br />notations and future revisions <br />4. Minimum sheet size: 11" x 17" <br />B. <br />Format of listings: The chronological order of the <br />start of each item of work <br />C. <br />Identification of listings: By major specification <br />section numbers <br />1.04 CONTENT OF SCHEDULES <br />A. <br />Construction Progress Schedule shall: <br />1. Show the complete sequence of construction by <br />activity <br />2. Show the dates for the beginning and <br />completion of each major element of <br />construction; specifically list: <br />a. Subcontractor work <br />b. Utility construction <br />C. Restoration <br />3. Show projected percentage of completion for <br />each item, as of the first day of each month <br />1.05 PROGRESS REVISIONS <br />A. <br />Indicate progress of each activity to date of <br />submission <br />B. <br />Show changes occurring since previous submission of <br />Schedule: <br />1. Major changes in scope <br />2. Activities modified since previous submission <br />3. Revised projections of progress and completion <br />4. Other identifiable changes <br />C. <br />Provide a narrative report as needed to define: <br />1. Problem areas, anticipated delays, and the <br />impact on the schedule <br />2. Corrective action recommended, and its effect <br />3. The effect of changes on sc-hedules of other <br />prime contractors <br />01311--2 <br />