40 <br />C7 <br />01311--2 <br />1. Provide separate horizontal bar for each trade <br />or operation <br />C' <br />2. Horizontal time scale: Identify the first <br />work day of each week <br />3. Scale and spacing: To allow space for <br />{ <br />notations and future revisions <br />4. Minimum sheet size: 11" x 17" <br />B. <br />Format of listings: The chronological order of the <br />start of each item of work <br />C. <br />Identification of listings: By major specification <br />section numbers <br />1.04 CONTENT OF SCHEDULES <br />A. <br />Construction Progress Schedule shall: <br />1. Show the complete sequence of construction by <br />activity <br />2. Show the dates for the beginning and <br />completion of each major element of <br />construction; specifically list: <br />a. Subcontractor work <br />b. Utility construction <br />C. Restoration <br />3. Show projected percentage of completion for <br />each item, as of the first day of each month <br />1.05 PROGRESS REVISIONS <br />A. <br />Indicate progress of each activity to date of <br />submission <br />B. <br />Show changes occurring since previous submission of <br />Schedule: <br />1. Major changes in scope <br />2. Activities modified since previous submission <br />3. Revised projections of progress and completion <br />4. Other identifiable changes <br />C. <br />Provide a narrative report as needed to define: <br />1. Problem areas, anticipated delays, and the <br />impact on the schedule <br />2. Corrective action recommended, and its effect <br />3. The effect of changes on sc-hedules of other <br />prime contractors <br />01311--2 <br />