Laserfiche WebLink
+0 <br />40 <br />" <br />C. <br />Maintain documents in a clean, dry, legible <br />condition and in good order. Do not use record <br />" <br />documents for construction purposes. <br />D. <br />Make documents and samples available at all times <br />" <br />for inspection by Engineer. <br />I, <br />1.03 MARKING DEVICES <br />A. <br />Provide felt tip marking pens for recording <br />information in the color red. <br />1.04 RECORDING (SEE ALSO SPEC= CONDITIONS) <br />A. <br />Label each document "PROJECT RECORD" in neat large <br />printed letters. <br />B. <br />Record information concurrently with construction <br />progress. DO NOT conceal or backfill any work <br />until required information is recorded. <br />C. <br />Drawings: Legibly mark to record actual <br />construction: <br />1. Depths of various elements of construction in <br />relation to N.G.V.D. 1929. <br />2. Horizontal and vertical locations of <br />underground utilities and appurtenances, <br />referenced to permanent surface improvements. <br />3. Location of internal utilities and <br />appurtenances concealed in the construction, <br />referenced to visible and accessible features <br />of the structure. <br />A. Field changes of dimension and detail. <br />5. Changes made by field order or by change <br />order. <br />5. Details not on original contract drawings. <br />D. Specifications and Addenda: Legibly mark each <br />section to record: <br />01720-2 <br />