My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-049
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-049
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2023 10:10:37 AM
Creation date
7/12/2023 9:54:22 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Miscellaneous
Approved Date
02/16/1999
Control Number
1999-049
Entity Name
Driveways Inc.
Subject
Cherrywood Estates Water Expansion Project# 98-05-DS
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br />f <br />3. Work site traffic control shall be <br />provided in conformance with <br />""Florida Department of <br />Transportation Roadway and Traffic <br />Design Standards," <br />+ 4. Asphalt restoration will be required <br />within fifteen (15) days after <br />temporary patch is installed. The <br />final finish shall be smooth and <br />uniform within a one-quarter (1/4) <br />inch tolerance of the required <br />surface. <br />5. Shoulder, right-of-way sodding, and <br />other restoration shall be performed <br />as required by the public works <br />director in accordance with Florida <br />Department of Transportation <br />Standards. <br />6. Traffic control devices (e.g. signs, <br />street name signs, traffic signals <br />and pavement markings) shall be <br />restored to their original condition <br />or better. <br />T. prior to final release of the <br />performance bond, which shall occur <br />no sooner than ninety (90) days <br />after final pavement restoration, <br />the engineer -of -record or utility - <br />company shall request a final <br />inspection, shall certify that the <br />utility has been installed in <br />accordance with standards specified <br />in the publications listed in <br />section 312.08, shall submit two (2) <br />copies of as -built drawings, and <br />shall submit release of lien by <br />contractors. <br />8. All utility structures will be <br />required to have an identification <br />tag designating proper ownership. <br />1.02 RESTORATION <br />All surfaces, as described, shall be completed as soon as <br />is reasonable. in no case shall the pavement or driveway <br />replacement operation be unfinished for more than 10 days <br />after backfilling unless otherwise directed by the <br />Engineer. Replace all damaged or cut pavement dine to <br />contractor's operations; restore all pavement outside of <br />trench area that is damaged by the Contract at iiu exp—nse <br />l" to Owner. <br />02576--3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.