My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-057
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2023 12:51:44 PM
Creation date
7/12/2023 12:51:02 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
03/02/1999
Control Number
1999-057
Entity Name
Waste Management Inc of Florida
Engineer: Camp Dresser & McKee Inc.
Subject
Change Order for IRC Landfill Construction & Partial Closure
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C-1 <br />+4TTA-,Amro i 1 <br />PRECAST CONCRETE BARRIERS <br />Response to Comments <br />1. The following breakdown illustrates the potential credit for substitution of the HDPE rainflap <br />for the precast concrete barriers: <br />Total linear feet of barricades required 1075 <br />Credit on Bid Items <br />Precast barricade price per foot $16.90 <br />Total Price $17,200.00 <br />(price per phone quote from U.S. Precast Corp.) <br />10 oz,. Geotextile price per yd2 $0.69 <br />Total Price $328.00 <br />(prise per phone quote from TNS) <br />Excavator to place barricades — 8 hours $98.00Ihr <br />Total Price $784.00 <br />$18,308.00 <br />Cost for HDPE Rainflap <br />Installation — By ESI $6.601f1 Total Cost $7,260.00 <br />(1075 feet of extrusion welding) <br />Material — 6050 ft2 $0.3284/62 Total Cost $1,986.82 <br />(5.5 feet wide, 1075 feet long) <br />Shipping From Las Vegas $3256.49 Total Cost $3,256.49 <br />($1.37 per mile- 2377 miles) <br />$12,503.31 <br />Credit on Bid Items $18,308.00 <br />-Cost for HDPE Rainflap -$12,503.31 <br />Net Credit to the County $5,804.69 <br />2. See attached detail. <br />3. The rain flap will be installed by ESI following the completion of the Segment I liner. <br />
The URL can be used to link to this page
Your browser does not support the video tag.