My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-057
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2023 12:51:44 PM
Creation date
7/12/2023 12:51:02 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
03/02/1999
Control Number
1999-057
Entity Name
Waste Management Inc of Florida
Engineer: Camp Dresser & McKee Inc.
Subject
Change Order for IRC Landfill Construction & Partial Closure
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
®r <br />0 <br />AI-Au,tma " 3 <br />SUBNHTTAL SHEET Waste Management Inc. of Florida <br />Ft. Lauderdale Office <br />2700 N.W. 48 Street <br />Pompano Beach, Florida 33073 <br />9541984-2000(Phone);954/984-2058(Fax) <br />TO: {Camp Dresser & Mckee Inc. DATE: 8/2511998 <br />1701 State Road A -1-A, Suite 204 JOB: IRC RFP No.7041 <br />Vero Beach, Florida 32963 INDIAN RIVER COUNTY LANDFILL <br />EXPANSIONIPARTIAL CLOSURE <br />8 <br />SUBMITTAL NO. D-41630-00- A <br />ATTENTION: John Ladner, P.E. <br />6 Prints) each of the following: Submittal DA 1630-007-A <br />Substitution - Corrugated PE Pipe (42720) <br />R. B. Baker Construction is requesting to reduce the number of pipe stubouts on the north and south <br />downcomber pipes located on the cast side of Segment 1. Reducing the number of pipe penetrations <br />to areas where rainflaps were installed would best serve future operations. Removal of the additional <br />stubouts would reduce the number of liner penetrations and minimize the potential of future <br />environmental contamination. <br />R. B. Baiter Construction is proposing to install stubouts at elevations 40, 60, 77 and 90 feet, R. B. <br />Baker Construction, Inc. is offering a credit o€$300.00 per stubout removed, for a total credit of <br />$1500,00. This credit is based on removing 3 stubouts from the south side and 2 on the north side- R. <br />B. Baker Construction will begin installing the south downcomber on August 26, 1998. <br />Thank you for your timely review of this submittal. <br />SHOP DFIAWING IYEVIEW <br />ENGINEER'S REVIEW <br />R{'PONS€CPEUIIIRE,),;, <br />C OPJTRACr()n <br />AOA"4+tU © h[Ot AypFavLU ❑ <br />COMI'm 0 - <br />An; rr"'ev A � r: .I :•.l ❑ C: gmpnr' <br />lacr,W <br />R--.1Al <br />Enpir.nerT rceiox p1 Ih,n Maptluwinp rY J -1-a 1, ti -e re+•rew O! <br />Ind rr•.1 co l.U�r.cy41aT iu[ dofrgn Cane,,pllv $e ppTillai anew tlOeS l•G lnj[act e iece lens <br />ln[! <br />r'r.YClq• rrdn•azrrare al dmlµluPU In rh11 e+drmnlp or Iron [he Cpnrre- <br />-�a•s cf�anfre�r�lY n1 etldroOYnp any der4M1bnv }rpm The CvnnKl G7atym• <br />In;i Tne Gaalnc[pl IS re PPdnlu6Pe Par 111p dOU116 opu Omen rv. at <br />aAhga[ian end menuiRLlure. dx IM11M W404de, IfGhnlquee a@gpencaf a! <br />praceduree c' cpnHruchdn rand AtllulR 4 hfa VWd In E $4%manner <br />CAM P ORESS6 6 MCKEE INC - <br />ori-Delr..� <br />By 5. ( `� <br />as a Management, Inc. of Florida <br />
The URL can be used to link to this page
Your browser does not support the video tag.