My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-061
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-061
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2023 1:09:07 PM
Creation date
7/12/2023 1:08:58 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Authorization
Approved Date
03/09/1999
Control Number
1999-061
Entity Name
Camp Dresser & McKee Inc.
Subject
Engineering Services Work Authorization 9/Alternate Disinfectioon Systems for the
North & South County Water Treatment Plant
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
II <br />A <br />IV Compensation for Services <br />Task 900 -Disinfection Systems Evaluation <br />$8,800 Upper Limit <br />Compensation for Task 900 is to be paid on a salary cost basis plus other direct costs on an as <br />needed basis. (See Attachment B), <br />A. Salary Cost Msik with 11�}� i er I unit <br />For the Basic Services performed on a salary cost basis with an upper limit, IRC <br />agrees to pay CDM as follows: <br />For engineering services performed by CDM, the payment will be equal to the salary cost <br />of such services for each employee times 2.3 for overhead and profit plus actual out-of- <br />pocket expense costs. Salary cost is equal to 1.393 times direct salary costs and is defined <br />as the cost of salaries (including sick leave, vacation, and holiday pay applicable thereto) <br />for time directly chargeable to the project; pltss unemployment, excise, and payroll taxes; <br />and contributions for social security, employment compensation insurance, retirement <br />benefits, and medical and other group insurance benefits. <br />Actual out-of-pocket expense costs are all costs other than salary costs that are incurred <br />during the progress of the work. the actual out-of-pocket expense costs include: air fare, <br />automobile rental if required, mileage charges, parking tolls, taxi, meals, lodging, <br />telephone, printing and reproductions costs, and other miscellaneous costs incurred <br />specifically for this project. The maximum cost for blueprint sheets is $1.40. The <br />maximum cost for Mylar sheet is $1 1.00 and sepia sheet is $5,00. the charges for in-house <br />computer program and word processor usage will be at CDM's regular rates. For outside <br />computer services, charges will be made at invoiced cost to CDM. <br />For the basic services performed on a salary cost basis with an upper limit, IRC agrees to provide a <br />written request before work is started by CDM. <br />SUBMITTED BY: <br />CAMP DRESSER & McKEE INC. <br />(Consultant) <br />E. Lawrence Adams, Jr., P.E. D.I.F. <br />Vice President <br />Date_ 2L t t [ � 9 <br />APPROVED BY: <br />INDIAN RIVER COUNTY <br />BOARD OF COUNTY COMMISSIONERS <br />By <br />14nucth R. Mac it <br />Chairman / <br />
The URL can be used to link to this page
Your browser does not support the video tag.