My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-062
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-062
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2023 10:05:51 AM
Creation date
7/27/2023 10:02:46 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Miscellaneous
Approved Date
03/16/1999
Control Number
1999-062
Entity Name
Spillis Candella & Partners, Inc.
Subject
Administration Building Space Needs Study/Master Planning Document
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EE <br />40 <br />Spillis Candela & Partners, Inc. <br />10. <br />Purchasing/Warehouse Bldg. <br />@ $60.00/SF (35,000 SF) <br />$ 2,100,000.00 <br />Total <br />$21,487.280.00 <br />B. To renovate the existing 170,000 GSF Vero Mall for conversion to the <br />County Administrative Facility we estimate the costs to be: <br />0. <br />Demolition costs for existing Interior Const. <br />$ 1,360,000.00 <br />1. <br />Site Work <br />$ 750,00.00 <br />2. <br />Structure (Hurricane Bracing) <br />$ 350,000.00 <br />3. <br />Exterior walls (openings for windows) <br />$ 800,000.00 <br />4. <br />Roof (170,000 GSF) + patching holes <br />$ 425,000.00 <br />5. <br />Interior Finishes <br />$ 5,100,000.00 <br />6. <br />HVAC <br />$ 2,380,000.00 <br />7. <br />Plumbing/Fire Protection <br />$ 1,600,000.00 <br />8. <br />Electrical/Security <br />$ 3,060.000.00 <br />Sub Total <br />$15,825,000.00 <br />9. <br />Contingency @ 1211, <br />$ 1,899,000.00 <br />Sub Total <br />$17,724,000.00 <br />10. Purchasing/warehouse bldg. <br />@ 60.00/SF (35,000SF) $2,100,000.00 <br />Total $19,824 -0 H <br />The estimated cost per square for 170,000 GFS of new construction is <br />$19,387,280.00 or $114.04/SF. The estimated cost for renovating the Mall is <br />17,724,000.00 or $104.26/SF. <br />The price to renovate the veru iviaii is exclusive of purchase price for the Mall and <br />its acreage and the price for new construction is also exclusive of land costs. <br />In addition, the professional fees for renovation work usually run in the 9-11% of <br />construction costs while the fees for new work are in the 6 to 7% range. This <br />difference (say 6.5% Vs 9.5%) or 3% is a substantial sum based on an estimated 18 <br />million of construction costs (± 540,000.00) <br />In conclusion, SCP does not recommend that the Vero Mall be converted into the <br />L County Administrative Complex. <br />
The URL can be used to link to this page
Your browser does not support the video tag.