Laserfiche WebLink
Eil <br />Even though it is only a good guess at this time, the planning team felt it was appropriate to show <br />where, when and how much future expansion space will be required beyond the year 2010. <br />Shown as Phase II in this report is an administrative addition of 40,000 SF (two stories) west of the <br />Phase I Building. When this addition is built beyond 2010, its square footage will require an <br />additional 120 parking spaces. Also, sixty-five cars displaced by the new construction, must be <br />replaced. The total of 185 spaces will be built in the northern surface lot as shown in the Phase II <br />site plan. <br />Parking calculations <br />Phase I <br />Proposed Phase I Administration Building. <br />-163,980 GSF @ 3 spaces/1000 SF = 492 spaces required. <br />Proposed Purchasing/Buildings and Grounds/Probation Building <br />-27,985 GSF @ 3 spaces/1000 SF = 84 spaces required. <br />Total Parking Required 576 spaces <br />Total Parking Provided 576 spaces <br />Phase II <br />Phase I Administration Bldg. 163,980 GSF = 492 space required. <br />Phase II Administration Bldg. 40,000 GSF = 120 spaces required. <br />Purchasing/Buildings and Grounds/Probation Building = 84 spaces required. <br />Total Parking Required - 696 spaces. <br />Total Parking Provided — 696 spaces <br />Prior to completing this master planning task, Indian River County asked the planning team to <br />evaluate the vacant Vero Mall to ascertain whether or not it could be utilized as the County <br />Administrative Facility. The planning team believes the vacant mall is inappropriate for <br />conversion to the County Administrative Facility. That study is included as Appendix A with this <br />report. <br />Executive Summary <br />Page 1-5 <br />