Laserfiche WebLink
40 <br />• <br />5. Funds from this Agreement may not be expended on salaries, training, or parts replacement or repairs to <br />rented or contractor owned equipment. <br />DEPLOYMENT LOCATION OF REEF UNITS <br />6. In accordance with the information submitted in the County's 1998-99 artificial reef competitive grant <br />application, materials will be placed in up to four one mile square permit sites at the center locations of <br />each site which are designated as follows: <br />North Latitude West Longitude Depth Distance and Bearing <br />from Sebastian Inlet <br />Reef Site #1 270 55.401' 800 20.059' 55 feet 58.50, 7.2 nm. <br />Reef Site #2. 270 55.507' 800 15.507' 66 feet 69.7°, 11.2 tin. <br />Reef Site #3 270 54.299' 80° 13.276 71 feet 88°, 13.7 nm. <br />Reef Site #4 270 55.103' 800 12.299' 73 feet 80°, 15.1 nm. <br />REEF DEPLOYMENT OVERSIGHT. The County's Contract Manager shall oversee the temporary <br />marking of each patch reef deployment location in advance of reef unit deployment in order to assist the <br />subcontractor in the proper placement of reef units. The markers shall be colored buoys no less than 12 <br />inches in diameter and sufficiently anchored so that they will not drift off the designated deployment sites <br />prior to deployment. The Department will not pay for materials placed outside the permit areas as <br />described at the time of deployment. <br />9. The County's Contract Manager or County employee designated as an official observer shall remain on <br />site during the entire deployment phase of the operation and confirm the Differential GPS coordinates of the <br />individual placements as well as the maximum vertical relief of the constructed reefs <br />10. Both the County and its subcontractor shall have on site current nautical charts of the deployment <br />area, with the permitted site indicated on the chart, and the proposed patch reef coordinates. The County <br />observer shall also be in possession of a copy of the permit for the areas where the deployments are taking <br />place. <br />11. The County agrees to allow the Department to conduct on-site inspections of the saltwater artificial <br />fishing reef project before, during, and after the deployment. <br />LIABILITY AND RESPONSIBILITY FOR REEF MATERIALS <br />12. Upon initiation of the construction of these reef units by the County's subcontractor, all liability, risk <br />of loss and responsibility for the safe handling, storage, transportation and deployment of the materials <br />shall be borne by the subcontractor. This liability, assumption of risk and responsibility shall remain with <br />the subcontractor until the materials are deployed at the permitted reef site in accordance with the <br />specifications in this Agreement. <br />PAYMENT SCHEDULE <br />DEP Contract Agreement No. OFMAS-122. Attachment A. Page 2 of 3 <br />