My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-096
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-096
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2023 2:34:20 PM
Creation date
7/27/2023 2:34:06 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Authorization
Approved Date
04/06/1999
Control Number
1999-096
Entity Name
Camper Dresser & McKee Inc.
Subject
Engineering Service Work Authorization #7 Risk Management/Accidental Release Prevention Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />40 <br />IV.. Compensation for Services <br />Task 700 Risk Management/Accidental release $2¢,150 Upper Limit <br />Prevention Plan - Hazard Analysis/Assessment <br />Compensation for Task 700 is to be paid on a salary cost basis plus other direct costs oil an as <br />needed basis. (See Attachment B), <br />A. Salary Cost. Basis withUpper Limit <br />For the Basic Services performed oil a salary cost basis with an upper limit, CRC <br />agrees to pay CDM as follows: <br />For engineering services performed by CDM, the payment wiil be equal to the salary cost <br />of such services for cacti employee times 2.3 for overhead and profit plus actual out-of- <br />pocket <br />ut-ofpocket expense costs. Salary cost is equal to 1.393 times direct salary costs and is defined <br />as the cost of salaries (including sick leave, vacation, and holiday pay applicable thereto) <br />for time directly chargeable to the project; plus unemployment, excise, and payroll taxes; <br />and contributions for social security, employment compensation insurance, retirement <br />benefits, and medical and other group insurance benefits. <br />Actual out-of-pocket expense costs are all costs other than salary costs that are incurred <br />during the progress of the work. the actual out-of-pocket expense costs include: air fare, <br />automobile rental if required, mileage charges, parking tolls, taxi, meals, lodging, <br />telephone, printing and reproductions costs, and other miscellaneous costs incurred <br />specifically for this project. The maximum cost For blueprint sheets is $1.10. The <br />maximum cost for mylar sheet is $11.00 and sepia sheet is $5.00. the charges for in-house <br />computer program and word processor usage will be at CDM's regular rates. For outside <br />computer services, charges will be made at invoiced cost to CDM. <br />For the basic services performed on a salary cost basis with an upper limit, IRC agrees to provide a <br />written request before work is started by CDM. <br />SUBMITTED BY: <br />CAMP DRr-,SSFR & McKEE INC <br />(Consultant) <br />E. Lawrence <br />Vice President <br />APPROVED BY: <br />INDIAN RIVER COUNTY <br />BOARD OF COUNTY COMMISSIONERS <br />�k{enneth R. Macht <br />Chairman J <br />Date - ! 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.