My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-096
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-096
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2023 2:34:20 PM
Creation date
7/27/2023 2:34:06 PM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40 <br />40 <br />ATTACHMENT B <br />SCOPE OF WORK <br />Task 700 - RiSK MANAGEMENT/ACCIDENTAL REi..EASE PREVENTION PIAN <br />HAZARD ANALYSISIASSESSMENT <br />Legislation signed as part of the Clean Air Act Amendments (November 15, 1990) included provisions <br />for regulations to be issued by the Environmental Protection Agency (EPA) that would provide <br />significant protection in the event of an accidental release of a hazardous substance. In separate <br />regulations promulgated on January 31, 1994, and on June 20, 1996, EPA created the Accidental Release <br />Prevention (ARP) program. These regulations require that all facilities affected by the ARP program <br />prepare and submit a risk management plan (RMP) no later than June 21, 1999, which documents the <br />hazard assessment, prevention program, and emergency response program necessary to protect public <br />health and the environment in the event of a catastrophic release of some 140 regulated substances. <br />Consistent with these requirements, the County has formed a team composed of utility, risk management <br />and emergency services staff to develop a strategic approach to comply with and to implement the ARP <br />program at its water and wastewater treatment facilities. <br />This work authorization provides for performanee of hazard analysis/assessment and offsite consequence <br />analysis by CDM personnel For inclusion in the County's Risk Management/Accidental Release <br />Prevention Plan. CDM will perform the following tasks at the South County WTP, North County WTP, <br />South County WWTP and Central Region WWTP: <br />Task 1 - Review and 'Validate Process Safety Information <br />CDM will review the safety information for the regulated process (chemical data, technology of the <br />process, and process equipment). Specifically, CDM will review information on the toxicity, reactivity, <br />stability, and corrosivity of each chemical in the process with particular attention to the hazardous effects <br />of inadvertent mixing that could occur. We will also review the information available on site regarding <br />the technology of the process including process flow diagrams, operating procedures, process chemistry, <br />safe upper and lower limit operating conditions (temperature, pressure, flows, and composition), and the <br />consequences of deviations. Finally CDM will review process equipment information including process <br />and instrumentation diagrams (P&[Ds), electrical classification, reliefand ventilation systems, safety <br />interlocks, and material and energy balances. We will note significant discrepancies prior to completing <br />tile Process Hazard Analysis. The purpose of this review is to verify that the quantity and quality of <br />information available is adequate to allow the process hazard analysis team to work efficiently. <br />Task 2 - Process Hazard Analysis (PHA) <br />With the participation of three to six County employees, two CDM employees will conduct a process <br />hazard analysis for the disinfection processes at the County's two water treatment plants and two <br />wastewater treatment plants (South and Central). This review will involve an analysis of, factors that <br />can lead to disruptions of the disinfection gas processes, the likely consequences of a release, and <br />interventions that can reduce the probability or severity of a release. County personnel that will need to <br />attend include process operators (one senior and one junior, if available), maintenance personnel, and at. <br />least one technical or supervisory employee who has experience and knowledge specific to the <br />disinfection process. While this process usually takes three three-hour meetings, we ask the County to <br />make these persons available for four such meetings (morning and afternoon of two days) at each <br />facility. <br />
The URL can be used to link to this page
Your browser does not support the video tag.