Laserfiche WebLink
CDOG-E-5 <br />PROGRAM IMPACT <br />SUMMARY FORM <br />Instructions: Enter scores from PROJECT IMPACT (Form COBG•E-4) into the chart below: <br />Measure and (Maximum Points) Points <br />Scared <br />t. LEVERAGE (150 MAXIMUM) Subscores <br />A. Padicipaling Party Leverage (150) i50 <br />B. Public Leverage, non -local sources (75) _0 <br />C. Public Leverage, local sources (75) 0 150 <br />150 Points Maximum <br />it. JOB BENEFIT TO LMI PERSONS (450 MAXIMUM) <br />A. Cost per FTE Job (150) 90 <br />8. LMI Job Ratio (150) 156 <br />C. FTE LMI Jabs CreatedlRetained (150) <br />454 Points Maximum <br />III. FOR LOANS ONLY: SCORE REDUCTION FOR LESS <br />THAN 50% INVESTMENT RATIO AT THE JOB <br />CREATION LQCATtQN, IF APPLICABLE <br />0 <br />-251 Faints Maximurin <br />IV. OTHER COMMUNITY DE=VELOPMENT <br />ACTIVITIES (50 MAXIMUM) <br />A. Economic Development Element (20) �0 <br />B. Empowerment or Enterprise Zone (10) <br />C. Workshop Attendance (10) 1 <br />D. WAGES Impact Score (10) 0 <br />30 <br />50 Paints Maximum <br />TOTAL PROGRAM IMPACT SCORE <br />550 <br />_ <br />650 Points Maximum <br />A MINIMUM PROGRAM IMPACT SCORE OF 440 IS REQUIRED TO BE <br />ELIGIBLE FOR FUNDING °`** <br />RECORD THE TOTAL PROGRAM IMPACT SUMMARY SCORE ON CDBG-E-1 <br />21 <br />