Laserfiche WebLink
rrclmlie dAppraaell <br />Pages a <br />Task 1.9 Prepare Geotechnical <br />A Geotechnical and Sand Source Investigation Report will be generated which will detail <br />the field, interpretive and laboratory procedures utilized to acquire and analyze the <br />geophysical data, geophysical and geotechnical data, core logs, GSD for each test <br />sample (assuming four samples per core) and preparation of maps. The above <br />• interpretive: maps will accompany graphics of the areas investigated from the side scan <br />grid and bathymetric surveys for candidate borrow areastsources containing suitable <br />sands for beach placement. <br />The side scan data will he generated as a plan view interpretive AutoCAD format <br />rendering of the relative location of surficial sediment type, hardbottom features, and other <br />visible features from the side scan records. For costing purposes, it is assumed that side <br />scans and bathyrnetric surveys will reap a total area of 1,250 acres. Hardbottorn areas <br />identified by the side scan sonar images for locations within and contiguous to tine areas <br />surrounding the borrow areas will be investigated if these areas are anticipated to impact <br />on the design of the borrow area. It is further assumed that magnetometer surveys, if <br />required by FDEP, will be performed under a supplemental work order from the County <br />during the permitting process. <br />Sub -bottom Survey (Supplemental Work asRe-guired) <br />If sub -bottom data records are deemed necessary and performed to confirm the depths to <br />rock, the vibracores will provide the geophysical data necessary to map the sub -bottom <br />strata and sand/material layers. If rock is encountered within the candidate borrow areas <br />of the surrounding areas during the jet probe investigation, the acoustic records will utilize <br />the core(s) c'ata for "ground -truth" verification of the material thickness. The cost of <br />performing the seismic surveys concurrent to the side -scan surveys of the borrow areas <br />will not exceed $10,000. This work will include preparation of contour maps of the <br />thickness of sandy sediments and the elevation, referenced to NGVl7, of the underlying <br />bedrock will be prepared. ATM will provide a preliminary ranking of sand source areas <br />based on the sediment characteristics associated with each candidate borrow area. A <br />high-resolution, three-dimensional color contour map will be produced, as will mesh plots <br />of sand thickness and depth to bedrock. <br />Task 2; Environmental Assessment of Nearshore Hardbottom Resources <br />Introduction <br />The proposed Project initiatives for BPP Planning Sectors 1, 2, 3 and 7 comprise the <br />restoration of approximately 5.5 miles of Iridian River County Atlantic Ocean shoreline. It is <br />along these segments of shoreline where the hardbottom resource environmental <br />assessment (EA) will be concentrated. Verification -level work will be performed in Sector <br />5, (as indicated in Task 2.7), since an extensive hardbottorn mapping and characterization <br />effort was conducted in this area in 1993. <br />Task 2,1 Review of Published Information and Determine Field Inyestigation <br />Boundaries <br />As indicated in Task 1.1, previously prepared documents concerning nearshore biological <br />resources, aerial photographs, and Prefabricated Erosion Prevention Reef Project <br />monitoring efforts have resulted in the accumulation of information which will be reviewed <br />prior to conducting any field work in association will'i this Project. County files will be <br />accessed, and inquiries will be directed to the appropriate state and federal agencies (e.g„ <br />FDEP, USACE, U.S. Fish and Wildlife Service) to determine that all available information <br />on nearshore resources in the Project areas is properly reviewed. <br />Task 2.2 Video Transects to Perform t- iardbottomfReef Ma in <br />Natural resource mapping and hardbottom area characterization along the nearshore area <br />(to approximately -18 feet NGVD) contiguous to each sand placement area and nearshore <br />zone fronting the adjacent beaches that extend 1,OOD feet north and 3,000 feet south of <br />Project beach nourishment areas will be performed. This work will be conducted between <br />May 1 to June 30 or as soon as favorable weather and water clarity conditions permit. <br />ATM shall acquire all nearshore resource information within these boundaries and <br />pertaining to the proposed Project borrow area and fill area. <br />YP4PMW6 W9404 V4WI $;NWF 14 l4[iNK 1WN—, <br />