My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-118
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-118
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2023 1:39:12 PM
Creation date
8/1/2023 1:38:27 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
04/27/1999
Control Number
1999-118
Entity Name
Camp Dresser & McKee, Inc.
Wharton-Smith, Inc.
Subject
Change Order 3 Hobart Park Reverse Osmosis Plant
Application for Final Payment for work thru 12/31/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item No. <br />13 <br />Description: <br />Cover plates for future pumps and degasifier at clearwell. <br />Purpose: <br />Cover plates not included in contract. <br />Cost: <br />$749.00 <br />14 <br />Description: <br />Heat tracing of caustic tank/piping. <br />Purpose: <br />Credit to remove heat tracing from contract. <br />Cost: <br />($3,180.00) <br />15 <br />Description: <br />Provide and install miscellaneous valves and pipe supports. <br />Purpose: <br />Additional mechanical restraints not included in original bid, but <br />necessitated, <br />Cost: <br />$32,388.00 <br />16 <br />Description: <br />Additional electrical work at chlorine heaters, <br />Purpose: <br />Additional electrical conduit required for installation not specified or <br />shown on drawings, <br />Cost: <br />$841.00 <br />17 <br />Description: <br />Additional electrical work in chlorine room, <br />Purpose: <br />Additional electrical conduit required for installation not specified or <br />shown on drawings. <br />Cost: <br />$371.00 <br />1$ <br />Description: <br />Additional wiring between instrumentation cabinets. <br />Purpose: <br />Additional wiring required for proper communication between systems, <br />Cost: <br />$1,413.67 <br />19 <br />Description: <br />Additional electrical work at membrane room showers. <br />Purpose: <br />Additional conduit and alarm connection not specified or shown on <br />drawings. <br />Coast: <br />$621.00 <br />A-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.