Laserfiche WebLink
Item filo. <br />20 <br />Description: <br />Distribution chlorination system instrumentation modifications. <br />Purpose: <br />Additional instrumentation allows better flexibility of chlorination <br />system. <br />Costs <br />$749.00 <br />21 <br />Description: <br />Additional electrical work at well sites. <br />Purpose: <br />Additional wiring necessary to monitor well drawdown. <br />Cost: <br />$909.53 <br />22 <br />Description: <br />Extra engineering services associated with conduit excavation. <br />Purpose: <br />Extra engineering services required by Mosby/Dean due to conduit <br />excavation under membrane building slab. <br />Cost: <br />($708.75) <br />23 <br />Description: <br />Sunscreen at Odor Control control panel. <br />Purpose: <br />Sunscreen added to read data from control panel easier. <br />Cost: <br />$322.07 <br />24 <br />Description: <br />Credit for overhead crane and rollup door training. <br />Purpose: <br />County staff did not require specified training. <br />Cost: <br />($200,00) <br />25 <br />Description: <br />Relocation of pH probe on blend water line. <br />Purpose: <br />Probe relocated during startup to monitor blend water. Data <br />inconsistent at previous location.. <br />Cost: <br />$1,200.00 <br />26 <br />Description: <br />Contract reconciliation. <br />Purpose: <br />Deduct items not performed in contract. (see Exhibit B). <br />Cost: <br />($52,800.00) <br />A-4 <br />