Laserfiche WebLink
40 <br />e <br />INDIAN RIVER COUNTY, FLORIDA <br />CHANGE ORDER NO 3 <br />PROJECT NO: 8823 <br />PROJECT 58th Avenue Improvements/ 12th Street to 28th Street <br />CONTRACTOR: Dickerson Florida, Inc. <br />' IRC UTILITIES <br />04/27/99:ChangeOrder 3 <br />$695.75 ! <br />$1,337.05 <br />$1,868.50 <br />$4,578.64 <br />$2,258.99 <br />$1,422.70 <br />$1,760.00 <br />$4,900.00 <br />$2,200.00 <br />$5,841.00 <br />$13,573.00 <br />$4,160.00 <br />I <br />$4,950.00 <br />i <br />$2,475.001 <br />I <br />($320.00) <br />$622.00 i <br />$6,700.00 <br />$385.00 <br />$237.60 <br />i <br />$568.34 <br />$565.55' <br />($940.00)1 <br />I I <br />($762.50) <br />($1,244.00) <br />2 <br />P.O, Drawer 719 <br />Stuart, Florida 34995 <br />DATE OF ISSUANCE: <br />• 14 <br />S -78G, Modify oox (conflict 20' WM) I <br />1 <br />LS <br />1 $695.75 ! <br />15 <br />S -78F and S-80, Modify structure <br />1 ! <br />LS <br />$1,337.05 <br />openings to go above 54' RCP <br />16 <br />'S426, Modify structure for exist inv. <br />1 <br />LS <br />$1,856.50 <br />17 <br />S-82 to S -82C, Remove 18" RCP & <br />1 <br />LS <br />i $4,578.64 <br />plug opening S-62 <br />18 <br />S-83, Encase ductbank, reinstall 18" <br />1 <br />LS <br />$2,258.99 <br />RCP & modify box <br />19 <br />S-84, connect to 54" RCP <br />1 <br />LS <br />$1,422.701 <br />20 <br />Cut top off exist. MH at 288+40 <br />1 <br />LS <br />$1,760.00' <br />& install grate (S -WA) <br />21 <br />S -W, Cut in Type B base, field <br />1 <br />LS <br />$4,900.00 <br />!pourtop <br />22 <br />S-88, Construct curb inlet top on <br />1 <br />LS <br />$2,200.00 <br />;existing box & plug aaist. RCP to <br />south in box <br />23 <br />S -95B Modification <br />1 <br />LS <br />$5,841.001 <br />24 <br />!Bellsouth conflicts, STA 300+00 It. to <br />1 i <br />LS <br />`: $13,573.00 <br />STA 306+75 h. <br />'25 <br />Add conflict box between S -92A and 1 <br />LS <br />$4,180.00 <br />S-94, STA 299+90 (conflict <br />10" WM) <br />26 <br />Install Type "C" DBI (S -100F) at STA <br />11 <br />LS <br />I $4,950.00 <br />271+30.58 (substation) <br />27 <br />S-105 to S-106: Install 12"DIP & (2) <br />1 <br />LS <br />$2,475.001 <br />vertical endwalls <br />28 <br />Credit SS -33C <br />-0.64! <br />CY <br />$500.00 <br />'29 <br />Decreased production (36' RCP) <br />1 <br />LS <br />$622.00 <br />STA 275+20 to STA 278+17 <br />(Conflict 20" WM) <br />30 <br />Decreased production STA 272 to <br />i; <br />LS <br />$6,700.00! <br />STA 274 (conflict CVB duct not <br />located) <br />31 <br />S -1 00C, Saw cut htad•!;ali to <br />ii <br />LS <br />$385.001 <br />eliminate conflict with 16' `AMI <br />32 <br />S-104 to S -104A, lower (2) 'Abc : <br />11 <br />LS <br />$237.60 <br />optic cables <br />33 <br />S-101 and S102, grade & pipe sae <br />1 <br />LS <br />$568.341 <br />changes <br />34 <br />S-376, S -37C, S -37D, S-104, S-92 <br />5' <br />EA <br />1 $113.11 <br />cut box to finish grade <br />35 <br />Credit for raised inverts <br />-470 <br />LF <br />$2.00 <br />S -98,S -98A & S -100A <br />i <br />! <br />36 <br />Credit for eliminating removal of 15" <br />-1 <br />LS <br />$762.50 <br />RCP STA 294+70 to STA 297+40 <br />37 <br />Credit for road closure STA 312+00 <br />-0.5 <br />Day <br />$2,488.00. <br />' IRC UTILITIES <br />04/27/99:ChangeOrder 3 <br />$695.75 ! <br />$1,337.05 <br />$1,868.50 <br />$4,578.64 <br />$2,258.99 <br />$1,422.70 <br />$1,760.00 <br />$4,900.00 <br />$2,200.00 <br />$5,841.00 <br />$13,573.00 <br />$4,160.00 <br />I <br />$4,950.00 <br />i <br />$2,475.001 <br />I <br />($320.00) <br />$622.00 i <br />$6,700.00 <br />$385.00 <br />$237.60 <br />i <br />$568.34 <br />$565.55' <br />($940.00)1 <br />I I <br />($762.50) <br />($1,244.00) <br />2 <br />