<br />INDIAN RIVER COUNTY, FLORIDA
<br />CHANGE ORDER NO 3
<br />PROJECT NO: 8823
<br />PROJECT 58th Avenue Improvements/ 12th Street to 28th Street
<br />CONTRACTOR: Dickerson Florida, Inc.
<br />' IRC UTILITIES
<br />04/27/99:ChangeOrder 3
<br />$695.75 !
<br />$1,337.05
<br />$1,868.50
<br />$4,578.64
<br />$2,258.99
<br />$1,422.70
<br />$1,760.00
<br />$4,900.00
<br />$2,200.00
<br />$5,841.00
<br />$13,573.00
<br />$4,160.00
<br />I
<br />$4,950.00
<br />i
<br />$2,475.001
<br />I
<br />($320.00)
<br />$622.00 i
<br />$6,700.00
<br />$385.00
<br />$237.60
<br />i
<br />$568.34
<br />$565.55'
<br />($940.00)1
<br />I I
<br />($762.50)
<br />($1,244.00)
<br />2
<br />P.O, Drawer 719
<br />Stuart, Florida 34995
<br />DATE OF ISSUANCE:
<br />• 14
<br />S -78G, Modify oox (conflict 20' WM) I
<br />1
<br />LS
<br />1 $695.75 !
<br />15
<br />S -78F and S-80, Modify structure
<br />1 !
<br />LS
<br />$1,337.05
<br />openings to go above 54' RCP
<br />16
<br />'S426, Modify structure for exist inv.
<br />1
<br />LS
<br />$1,856.50
<br />17
<br />S-82 to S -82C, Remove 18" RCP &
<br />1
<br />LS
<br />i $4,578.64
<br />plug opening S-62
<br />18
<br />S-83, Encase ductbank, reinstall 18"
<br />1
<br />LS
<br />$2,258.99
<br />RCP & modify box
<br />19
<br />S-84, connect to 54" RCP
<br />1
<br />LS
<br />$1,422.701
<br />20
<br />Cut top off exist. MH at 288+40
<br />1
<br />LS
<br />$1,760.00'
<br />& install grate (S -WA)
<br />21
<br />S -W, Cut in Type B base, field
<br />1
<br />LS
<br />$4,900.00
<br />!pourtop
<br />22
<br />S-88, Construct curb inlet top on
<br />1
<br />LS
<br />$2,200.00
<br />;existing box & plug aaist. RCP to
<br />south in box
<br />23
<br />S -95B Modification
<br />1
<br />LS
<br />$5,841.001
<br />24
<br />!Bellsouth conflicts, STA 300+00 It. to
<br />1 i
<br />LS
<br />`: $13,573.00
<br />STA 306+75 h.
<br />'25
<br />Add conflict box between S -92A and 1
<br />LS
<br />$4,180.00
<br />S-94, STA 299+90 (conflict
<br />10" WM)
<br />26
<br />Install Type "C" DBI (S -100F) at STA
<br />11
<br />LS
<br />I $4,950.00
<br />271+30.58 (substation)
<br />27
<br />S-105 to S-106: Install 12"DIP & (2)
<br />1
<br />LS
<br />$2,475.001
<br />vertical endwalls
<br />28
<br />Credit SS -33C
<br />-0.64!
<br />CY
<br />$500.00
<br />'29
<br />Decreased production (36' RCP)
<br />1
<br />LS
<br />$622.00
<br />STA 275+20 to STA 278+17
<br />(Conflict 20" WM)
<br />30
<br />Decreased production STA 272 to
<br />i;
<br />LS
<br />$6,700.00!
<br />STA 274 (conflict CVB duct not
<br />located)
<br />31
<br />S -1 00C, Saw cut htad•!;ali to
<br />ii
<br />LS
<br />$385.001
<br />eliminate conflict with 16' `AMI
<br />32
<br />S-104 to S -104A, lower (2) 'Abc :
<br />11
<br />LS
<br />$237.60
<br />optic cables
<br />33
<br />S-101 and S102, grade & pipe sae
<br />1
<br />LS
<br />$568.341
<br />changes
<br />34
<br />S-376, S -37C, S -37D, S-104, S-92
<br />5'
<br />EA
<br />1 $113.11
<br />cut box to finish grade
<br />35
<br />Credit for raised inverts
<br />-470
<br />LF
<br />$2.00
<br />S -98,S -98A & S -100A
<br />i
<br />!
<br />36
<br />Credit for eliminating removal of 15"
<br />-1
<br />LS
<br />$762.50
<br />RCP STA 294+70 to STA 297+40
<br />37
<br />Credit for road closure STA 312+00
<br />-0.5
<br />Day
<br />$2,488.00.
<br />' IRC UTILITIES
<br />04/27/99:ChangeOrder 3
<br />$695.75 !
<br />$1,337.05
<br />$1,868.50
<br />$4,578.64
<br />$2,258.99
<br />$1,422.70
<br />$1,760.00
<br />$4,900.00
<br />$2,200.00
<br />$5,841.00
<br />$13,573.00
<br />$4,160.00
<br />I
<br />$4,950.00
<br />i
<br />$2,475.001
<br />I
<br />($320.00)
<br />$622.00 i
<br />$6,700.00
<br />$385.00
<br />$237.60
<br />i
<br />$568.34
<br />$565.55'
<br />($940.00)1
<br />I I
<br />($762.50)
<br />($1,244.00)
<br />2