40
<br />0
<br />•
<br />INDIAN RIVER COUNTY, FLORIDA
<br />CHANGE ORDER NO. 3
<br />PROJECT NO: 8823
<br />PROJECT 58th Avenue Improvements/ 12th Street to 28th Street
<br />CONTRACTOR: Dickerson Florida, Inc.
<br />$1,320.00
<br />P.O, Drawer 719
<br />$2,820.00!
<br />$2.75 ;
<br />$352.00
<br />b. STA 287+97.16 to STA324+00.50
<br />Stuart, Florida 34995
<br />SY
<br />$3,080.00
<br />($52,189.50)
<br />DATE OF ISSUANCE:
<br />($4,000.00)1
<br />i
<br />LF
<br />($5,852.00),
<br />B. Utilities
<br />'1 jCut in 6" Gate Valves, STA 250+97
<br />2
<br />FFA
<br />$660.00
<br />`
<br />& 260+32
<br />$1 430 00'
<br />-13288
<br />TON
<br />•2
<br />1,20" DIP WM Fittings_
<br />0.564
<br />TON
<br />$5,000.00
<br />'3
<br />-
<br />Remove & Replace EAsWv o-, G.V.
<br />1
<br />LS I
<br />$352.00
<br />ST A 250+99 L i
<br />1,
<br />i •4
<br />'Install (2) 6" G.V. in line while !
<br />1
<br />LS
<br />$154.00;
<br />relocating hydrant
<br />I
<br />'5
<br />,6" G.V. on FM north & south side of
<br />2
<br />EA
<br />$1,540.00
<br />16th Street
<br />!
<br />I
<br />!
<br />I •6
<br />Delete 6 x 6 Tapping Sleeve & Valve
<br />-2
<br />EA I
<br />$2,000.00
<br />north and south side of 16th Street j
<br />'7
<br />;20" DIP WM above ground
<br />-38 j
<br />LF
<br />$154.00
<br />•8
<br />120"
<br />DIP WM below ground
<br />371
<br />LF
<br />$158.00
<br />9
<br />iFira hydrant extension STA 291+
<br />1
<br />LS
<br />$1,163.03
<br />150 LT (conflict with private FM)
<br />10
<br />Hydrant relocation
<br />-1
<br />EA
<br />$900.00
<br />11
<br />1,4' Diameter Doghouse Manhole, FM
<br />1
<br />EA
<br />$1,430.00
<br />Air Release Valve
<br />C. Misc.
<br />I
<br />j
<br />1
<br />Variable Message Sign
<br />561
<br />ED j
<br />$38.00
<br />2
<br />Gravity Retaining Wall
<br />209 i
<br />LF
<br />$126.45
<br />3
<br />I1- torial Shelf Plantings
<br />1
<br />LS
<br />$1,270.56
<br />4
<br />2 Year Littorial Maintenance and
<br />1
<br />LS j
<br />$1,716.00
<br />Monitoring Program
<br />5
<br />Pour by hand & dowel curb STA 277
<br />1201
<br />LF
<br />$5.201,
<br />+ 20 to 278+40 (11.55-6.35=5.201
<br />LF extra)
<br />6
<br />Cut ez;sting concrete pavement
<br />120 i
<br />LF
<br />$2.86.
<br />7
<br />Failing in place density tests
<br />a. Report 1
<br />-41
<br />EA
<br />$15.00'
<br />Report 2
<br />-61
<br />EA !
<br />$15.00
<br />Report 5
<br />-11
<br />EA j
<br />$15.00
<br />:Report 8
<br />-13
<br />EA
<br />$15.001
<br />:Report 9
<br />-6
<br />EA
<br />$15.00 i
<br />Report 10
<br />-4
<br />EA j
<br />$15.00
<br />Report 11
<br />-14'
<br />EA
<br />$15.00'
<br />Report 12
<br />-101
<br />EA
<br />$15.001
<br />8
<br />Inspectors overtime hours (see
<br />1
<br />LS
<br />($3,208.64
<br />attached summary)
<br />9
<br />5' sidewalk, south side SR60, west
<br />98
<br />SY
<br />$14.25
<br />of 58th Avenue
<br />10
<br />Delete geogrid
<br />j
<br />$1,320.00
<br />-25651
<br />$2,820.00!
<br />$2.75 ;
<br />$352.00
<br />b. STA 287+97.16 to STA324+00.50
<br />$154.00
<br />SY
<br />$3,080.00
<br />($52,189.50)
<br />11 Temporary Concrete Barrier
<br />($4,000.00)1
<br />i
<br />LF
<br />($5,852.00),
<br />$5,846.00
<br />12 Relocate Concrete Barrier
<br />$1,163.03!
<br />LF
<br />$4.40'
<br />($900.00)
<br />$1 430 00'
<br />-13288
<br />$2,128.00
<br />$26,428.05
<br />$1,270.56
<br />$1,716.00
<br />$624.00
<br />$343.20
<br />$1,396.50
<br />($60.00)
<br />($90.00)
<br />($165.00
<br />($195.00)
<br />($90.00)
<br />($60.00)
<br />($210.00)
<br />($150.00)
<br />($3,208.64
<br />a. STA 258+90 to 267+00
<br />-25651
<br />SY
<br />$2.75 ;
<br />($7,053.75)
<br />b. STA 287+97.16 to STA324+00.50
<br />-18978'
<br />SY
<br />$2.75'.
<br />($52,189.50)
<br />11 Temporary Concrete Barrier
<br />-1000',
<br />LF
<br />$12.50
<br />($12,500.00)
<br />12 Relocate Concrete Barrier
<br />3048
<br />LF
<br />$4.40'
<br />$13,411.20
<br />13 Credit Off Site Base Material
<br />-13288
<br />TON
<br />0.385
<br />($5,115.88)
<br />thru April
<br />'IRC UTILITIES
<br />04/27/99:ChangeOrder 3
<br />3
<br />
|