My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-124
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-124
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2023 2:13:42 PM
Creation date
8/1/2023 2:13:19 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Miscellaneous
Approved Date
05/04/1999
Control Number
1999-124
Entity Name
Florida Dept. of Community Affairs
Subject
Modification 1 to Contractural Services Agreement
(1) Modification #1 to Inter-Local Agreement between BCC, IRC &
Treasure Coast Regional Planning Council (6)
(2) Modification 1 Municipality Subcontract Participant in Development of Local
Mitigation Strategy, Fellsmere
(3) Municipality Subcontract Participant in Development of Local Mitigation Strategy for Town of Orc
(4) Municipality Subcontract Participant in Development of Local Mitigation Strategy for
the Town of Indian River Shores
(5) Municipality Subcontract Participant in Development of Local Mitigation Strategy for Sebastian
(6) Municipality Subcontract Participant in Development of Local Litigation Strategy for Vero Beach
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
le.0 1A -Scapa d work <br />Aral Maisel— S1MtVgY <br />D. By April 30, 1999, the Department shall provide to the County: <br />1. Paper maps of the county -wide hazard areas vulnerable to srotm surge, inland <br />flooding and wind, along with tables listing the results of the risk analysis <br />providing, in particular, an estimate of potential costs and the likelihood of <br />specific tropical cyclone events. <br />2. A CD -Rom containing the following: <br />a. the results of the risk analysis for tropical cyclone events in a dBASE III <br />format, and <br />b. the demographic and property data on which the risk analysis was based. <br />E. By April 30, 1999, Contractor shall submit Working Group meeting minutes to the <br />Department for all meetings occurring during this period. <br />IV. 4a Contract Period-Delivembles due by October 31. 1999, <br />A. Complete the hazard identification and vulnerability assessment activities as outlined in <br />Section 5 of the Guidebook and as described in the Hazard Identification and <br />Vulnerability Assessment Supplernern. By October 31, 1999, create a county -wide multi - <br />hazard map based on the information supplied to the County by the Department during <br />the 30 period. <br />B. Contractor shall submit a list ofpotential mitigation initiatives as discussed in Section G <br />of the Guidebook to the Department by October 31, 1999. The list shall be based upon <br />the Community Guiding Principles and Hazard Ideniftcalion and Vulnerability <br />Assessment data developed in preceding contract period and compiled through the <br />procedures established in the second contract period. The list shall include potential <br />program, project, and policy initiatives at the county and municipal levels that have the <br />potential to reduce losses of life and property from natural disaster events including bill <br />not limited to: <br />initiatives to reduce vulnerability <br />studies (including engineering studies) to identify cast beneficial mitigation <br />activities <br />existing mitigation initiatives identified in existing local government Capital <br />Improvements Plans for future funding consideration <br />recommended program and policy actions and revisions to further promote <br />effective hazard mitigation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.