My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-144
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-144
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2023 3:24:15 PM
Creation date
8/4/2023 3:23:06 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
07/11/2023
Control Number
2023-144
Agenda Item Number
8.AD.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
Work Order No.1 for West Regional Wastewater Treatment Facility Effluent Reject System
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C&W Ref. 236614 <br />Opinion of Construction Costs will be provided at 90% and 100% <br />submittals. <br />Review for Coordination Purposes, Specifications prepared by KHA Engineers <br />Scope does not include Control Strategy Narratives for process control, KHA <br />Engineers to provide. <br />In house, Technical Review of Plans and Specifications <br />TASK 2 PERMITTING PHASE <br />Permitting for DEP approval is included <br />TASK 3 BIDDING PHASE <br />Attend a Pre-bid meeting <br />Respond to Contractor questions <br />Provide an addendum if necessary. <br />Provide our review of the bid as requested from KHA and IRC <br />TASK 4 CONSTRUCTION PHASE <br />Attend a Pre -Construction meeting <br />Respond to Contractor RFI questions, we don't anticipate more than three. <br />Provide a review of equipment shop drawings, we anticipate no more than four <br />equipment shop drawings. <br />Provide during the construction period up to four visits, we anticipate for the <br />construction to last approximately six months. <br />1- Attend two site visits during the monthly progress meeting, one visit shall <br />include a field inspection begore backfilling power and control conduits. <br />2- Provide a visit during the startup and testing phase, prepare a report and <br />a punch list. <br />3- Provide a final visit to check on outstanding punch list items and finalize our <br />Inspection. <br />Based on the above scope of work, the lump sum firm price fee for our service <br />will be as follows: <br />Task 1 Engineering Design Phase: $ 9,500.00 Lump Sum <br />Task 2 Permitting: $ 1,000.00 Lump Sum <br />Task 3 Bidding: $ 2,000.00 Lump Sum <br />Task 4 Construction Phase: $ 7,500.00 Lump Sum <br />Total Design fee: $ 20,000.00 Lump Sum <br />
The URL can be used to link to this page
Your browser does not support the video tag.