My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-144
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-144
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2023 3:24:15 PM
Creation date
8/4/2023 3:23:06 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
07/11/2023
Control Number
2023-144
Agenda Item Number
8.AD.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
Work Order No.1 for West Regional Wastewater Treatment Facility Effluent Reject System
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C&W Ref. 236614 <br />Notes and clarifications: <br />1. I&C Oneline Diagrams will be based on Kimley Horn and Associates P&I <br />Diagrams, adding conduit and wire tags. <br />2. Deliverables include drawings, specification, and opinion of construction costs <br />will be provided at 90, and 100% submittals. <br />3. We will provide conformed set of drawings after the binding period. <br />4. No value engineering time and effort has been added to this proposal, any value <br />engineering would be additional fee and scope to respond to comments and <br />attend meetings. <br />5. Limited construction services are included based on the scope provided. <br />I trust the above is in agreement with your expectations and the needs of this <br />project. We look forward to the opportunity to be of service to you. Please call if you <br />have questions or comments regarding the above. <br />Very truly yours, <br />C&W Engineering, Inc. <br />lea <br />Michael Guida, P.E. <br />cc: JLR/NL/file <br />
The URL can be used to link to this page
Your browser does not support the video tag.